GlueX Logo

Document List by Author

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

R. Chris Cuevas of Thomas Jefferson National Accelerator Facility is listed as an author on the following documents:

GlueX-doc-# Title Author(s) Topic(s) Last Updated
1022-v1 fADC250 - IEEE NSS 2007 Paper & Poster Dave Abbott et al. Readout
Trigger
DAQ
Electronics
26 Jan 2016
2554-v2 Level-1 Hardware Update R. Chris Cuevas Frontend
Rates, Trigger and DAQ
Trigger
DAQ
Electronics
01 Oct 2014
2468-v1 Hall D Trigger System - Status Report R. Chris Cuevas Frontend
Trigger
DAQ
Electronics
Data Rates
11 May 2014
2396-v1 Trigger Update R. Chris Cuevas Readout
Electronics
19 Feb 2014
2314-v1 Trigger Electronics -Status R. Chris Cuevas Trigger
DAQ
Electronics
Collaboration
Electronics
02 Oct 2013
2214-v1 12GeV Trigger Electronics R. Chris Cuevas Frontend
Trigger
DAQ
Electronics
02 Jun 2013
2137-v1 12GeV Trigger Hardware Status R. Chris Cuevas Frontend
Trigger
DAQ
Electronics
20 Feb 2013
2065-v1 Update on trigger electronics R. Chris Cuevas Frontend
Readout
Trigger
DAQ
Electronics
03 Oct 2012
1987-v1 12GeV Trigger Hardware Update R. Chris Cuevas Trigger
Electronics
Electronics
20 May 2012
1908-v1 12GeV Trigger Electronics R. Chris Cuevas Frontend
Trigger
DAQ
Electronics
DAQ
Design and Planning
15 Feb 2012
1735-v2 Trigger Electronics R. Chris Cuevas Rates, Trigger and DAQ
Frontend
Trigger
Presentation
Electronics
06 May 2011
1679-v1 12GeV Trigger Electronics - Status R. Chris Cuevas Frontend
Trigger
Electrical
Electronics
Presentation
02 Feb 2011
1590-v1 12GeV Trigger Electronics R. Chris Cuevas Frontend
Trigger
Electronics
Presentation
09 Sep 2010
1554-v1 12GeV Trigger Workshop Overview R. Chris Cuevas Frontend
Trigger
Electronics
Workshop
07 Jul 2010
1501-v1 12GeV Trigger Electronics R. Chris Cuevas Trigger
Electronics
10 May 2010
1399-v1 Trigger Status R. Chris Cuevas Trigger
27 Jan 2010
1341-v1 12GeV Trigger Electronics R. Chris Cuevas Frontend
Trigger
Electronics
DAQ
Data Rates
10 Sep 2009
1298-v1 12GeV Trigger Workshop R. Chris Cuevas Frontend
Trigger
08 Jul 2009
1028-v1 Integrated Tests of a High Speed VXS Switch Card and 250 MSPS Flash ADC Fernando J. Barbosa et al. Frontend
Trigger
Electronics
21 Apr 2008
1027-v1 Integrated tests of a high speed VXS switch card and a 250Msps Flash-ADC Fernando J. Barbosa et al. Frontend
Trigger
Electronics
21 Apr 2008
1014-v1 On Line Working Group -- Status update R. Chris Cuevas Frontend
Trigger
Design and Planning
28 Mar 2008
769-v1 Energy Sum Module R. Chris Cuevas Frontend
Trigger
Electronics
Workshop
28 Mar 2007
768-v1 JLAB Fast Electronics R. Chris Cuevas Frontend
Electronics
28 Mar 2007
700-v1 Electronics Projects -- Progress report R. Chris Cuevas Electrical
Electronics
12 Oct 2006
642-v1 Electronics Manpower Issues R. Chris Cuevas Electronics
27 Apr 2006
603-v1 April 2006 -- Status Report R. Chris Cuevas Frontend
Electronics
07 Apr 2006
614-v1 GlueX Electronics Plan Dave Abbott et al. Frontend
Electronics
07 Apr 2006
530-v1 16 channel VME discriminator/scaler R. Chris Cuevas Electronics
13 Sep 2005
499-v1 Infrastructure May 2005 R. Chris Cuevas Electrical
Electronics
Presentation
13 May 2005
466-v1 Electronics R. Chris Cuevas Electronics
Presentation
28 Apr 2005
409-v1 Maintenance talk from electronics workshop R. Chris Cuevas Engineering
Frontend
Electronics
Workshop
08 Dec 2004
404-v1 GlueX electronics infrastructure talk from electronics workshop R. Chris Cuevas Integration
Frontend
Electrical
Electronics
07 Dec 2004
318-v1 Production update / F1 TDCs R. Chris Cuevas None
21 Sep 2004
300-v1 AC Mains and Grounding R. Chris Cuevas Electrical
11 Sep 2004
121-v1 GlueX Electronics Review R. Chris Cuevas Presentation
08 Jul 2004

Number of documents found: 35

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.6, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.26 usr + 0.07 sys = 0.33 CPU)