GlueX Logo

Document List by Topic

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Commissioning (subtopic of GlueX Experiment) are available:
(List events on Commissioning)

GlueX-doc-# Title Author(s) Topic(s) Last Updated
2545-v4 HALL D WORKER SAFETY AWARENESS TRAINING (SAF113) Mark Macrae Dalton et al. Mechanical
Engineering
Infrastructure
Design and Planning
Reviews
Electrical
11 Jan 2023
4294-v4 The GlueX Beamline and Detector Elton Smith GlueX Experiment
Production
Photon Beam
Calibration and Reconstruction
Accelerator
Commissioning
Pair Spectrometer
Diamond Radiator
Collimator
Polarimetry
02 Jun 2020
3064-v1 The GlueX Start Counter & Beam Asymmetry $\Sigma$ in Single $\pi^{0}$ Photoproduction Eric Pooser Commissioning
Analysis
Start Counter
06 Sep 2017
3019-v3 Monitoring of the beam properties Alexandre Deur Commissioning
11 May 2016
3009-v1 Summary of the Spring 2016 commissioning run Alexandre Deur Commissioning
09 May 2016
2930-v2 Fall 2015 and Spring 2016 run Alexandre Deur Commissioning
17 Feb 2016
2832-v2 Run Plan Discussion Alexandre Deur et al. Collaboration
Commissioning
08 Oct 2015
2827-v1 Online/L3 Status David Lawrence Trigger
DAQ
DAQ
Online
Rates, Trigger and DAQ
General
Data Rates
Commissioning
Online
Computing
07 Oct 2015
2758-v1 Journal Club: Vector-Meson Production by Polarized Photons at 2.8, 4.7, and 9.3 GeV David Mack Commissioning
12 Jun 2015
2748-v2 Polarized production of rho mesons Matt Shepherd Presentation
Commissioning
Analysis
20 May 2015
2712-v1 Summary of Spring 2015 Commissioning run Alexandre Deur Commissioning
11 May 2015
2649-v1 Fall 2014 run summary Alexandre Deur Commissioning
19 Feb 2015
2561-v1 Commissioning Plans Alexandre Deur Commissioning
02 Oct 2014
2544-v1 Radiological Safety Analysis Document for Photon Beam Commissioning to Hall D Pavel Degtiarenko et al. Commissioning
03 Sep 2014

Number of documents found: 14

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.6, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.38 usr + 0.10 sys = 0.48 CPU)