Document List by Author
Elton Smith of Thomas Jefferson National Accelerator Facility is listed as an author on the following documents:
(List events moderated by Elton Smith)
GlueX-doc-# |
Title |
Author(s) |
Topic(s) |
Last Updated |
2545-v4 |
HALL D WORKER SAFETY AWARENESS TRAINING (SAF113) |
Mark Macrae Dalton et al. |
Electrical
Mechanical
Engineering
Infrastructure
Reviews
Design and Planning
|
11 Jan 2023 |
5373-v2 |
Production Testing of MWPCs for CPP |
Alexander Austregesilo et al. |
MWPCs
Electronics
|
01 Dec 2021 |
5079-v3 |
Response to the ERR for E12-13-008/E12-13-008A |
Mark Ito et al. |
Project Status
Planning
General
Reviews
|
24 May 2021 |
4898-v4 |
Project implementation, resources and schedule |
Elton Smith |
Reviews
Proposal
General
|
05 Feb 2021 |
4796-v1 |
TOF trigger rate study with the upgraded TOF detector and optional lead shielding |
Iliya Larin et al. |
Tagger Rates
Beam Test
|
22 Jan 2021 |
4670-v2 |
CPP Jeopardy PAC presentation |
Iliya Larin et al. |
GlueX Physics
GlueX Experiment
|
02 Dec 2020 |
4527-v4 |
Measuring Charged Pion Polarizability in the gamma gamma -> pi+pi- Reaction |
Iliya Larin et al. |
GlueX Physics
Proposal
|
02 Dec 2020 |
4600-v5 |
Measuring the Polarizability of the Neutral Pion with GlueX - Presentation to PAC48 |
Mark Ito et al. |
Amplitude Analysis
Proposal
|
26 Oct 2020 |
4373-v4 |
Measuring the Neutral Pion Polarizability |
Alexander Austregesilo et al. |
GlueX Physics
Amplitude Analysis
Proposal
PrimEx
|
01 Jul 2020 |
4294-v4 |
The GlueX Beamline and Detector |
Elton Smith |
Pair Spectrometer
Diamond Radiator
GlueX Experiment
Collimator
Commissioning
Calibration and Reconstruction
Production
Accelerator
Polarimetry
Photon Beam
|
02 Jun 2020 |
4478-v3 |
Measuring the Polarizability of the Neutral Pion with GlueX - May 2020 Collaboration Meeting |
Mark Ito et al. |
Amplitude Analysis
Proposal
|
19 May 2020 |
2910-v3 |
Comparison of JLab and UTFSM SiPM measurements |
Elton Smith |
Photodetectors
BCAL
|
22 Jul 2019 |
3649-v3 |
AmpTools and File Conversions |
Elton Smith |
Computing
Amplitude Analysis
General
Online
Log-likelihood fitting
|
28 Mar 2019 |
3744-v2 |
Measurements of Meson Polarizabilities |
Iliya Larin et al. |
GlueX Physics
|
20 Nov 2018 |
2913-v5 |
Development of Silicon Photomultipliers and their Applications to GlueX Calorimetry |
Elton Smith |
Photodetectors
Readout
BCAL
|
06 Sep 2017 |
1777-v1 |
Test Results for the 80 First Article Samples of the Hamamatsu Array |
Fernando J. Barbosa et al. |
Photodetectors
BCAL
|
06 Sep 2017 |
2529-v5 |
First Look at APD Samples |
Shayne Gryba et al. |
Photodetectors
|
28 Aug 2014 |
1784-v3 |
Acceptance Studies for the Production Light Guides of the BCAL |
Elton Smith |
BCAL
Optical Ray Tracing
|
04 Oct 2013 |
1432-v6 |
Trapezoidal guides for the light collection for SiPMs |
Elton Smith |
BCAL
|
04 Oct 2013 |
2016-v5 |
GlueX: Photoproduction of Hybrid Mesons |
Elton Smith |
GlueX Physics
|
02 Aug 2012 |
1976-v1 |
Charged Pion Polarizability LOI |
David Lawrence et al. |
General Theory
|
04 May 2012 |
1071-v4 |
Performance of the prototype module of the GlueX electromagnetic barrel calorimeter |
Daniel S. Carman et al. |
Beam Test
Analysis
BCAL
|
12 Apr 2012 |
1723-v1 |
GlueX Detector (Poster for DIS2011 tour) |
Eugene Chudakov et al. |
GlueX Physics
|
20 Apr 2011 |
1724-v1 |
GlueX Electronics (Poster for DIS2011 tour) |
Eugene Chudakov et al. |
Electronics
|
20 Apr 2011 |
1722-v1 |
GlueX Physics (Poster for DIS2011 tour) |
Eugene Chudakov et al. |
GlueX Physics
|
20 Apr 2011 |
1100-v1 |
BCAL Construction & Readout |
Zisis Papandreou et al. |
Photodetectors
Readout
BCAL
|
23 Jun 2010 |
599-v1 |
Electron Beam Deflection by Permanent Magnet |
Elton Smith et al. |
Radiation
Containment
General
Shielding
|
17 Mar 2009 |
1189-v1 |
The 12 GeV JLab Upgrade Project |
Elton Smith |
General
|
22 Jan 2009 |
843-v4 |
Calculations of magnetic shield effectiveness for long mu-metal cylinders |
Elton Smith |
Photodetectors
Field
|
24 Aug 2007 |
737-v3 |
CDC Design Parameters |
Curtis A. Meyer et al. |
CDC
|
20 Feb 2007 |
686-v1 |
Preparing for the CD-2 Review |
Elton Smith |
Overview
|
12 Oct 2006 |
662-v1 |
GlueX Reconstruction Software |
Curtis A. Meyer et al. |
Reconstruction
|
03 Jul 2006 |
567-v2 |
Summary of GlueX Beam Test Discussions |
Elton Smith |
Test Beam
|
30 Nov 2005 |
362-v2 |
Integration and Milestones |
Elton Smith |
None
|
15 Oct 2004 |
304-v1 |
TARGET |
Elton Smith |
Target
|
15 Sep 2004 |
278-v2 |
Hall D infrastructure and integration |
Elton Smith |
Integration
|
11 Sep 2004 |
173-v1 |
Memorandum of Understanding between the GlueX Collaboration, and Jefferson Lab |
Larry Cardman et al. |
Communications
|
08 Jul 2004 |
170-v1 |
Memorandum of Understanding between the GlueX Collaboration, Jefferson Lab, and Florida State University |
Alex R. Dzierba et al. |
Communications
|
08 Jul 2004 |
172-v1 |
Memorandum of Understanding between the GlueX Collaboration, Jefferson Lab, and Indiana University |
Alex R. Dzierba et al. |
Communications
|
08 Jul 2004 |
171-v1 |
Draft Proposal for Theory Collaborators in Gluex |
Simon Capstick et al. |
Communications
|
08 Jul 2004 |
169-v1 |
Memorandum of Understanding between the GlueX Collaboration, Jefferson Lab, and Florida International University |
Werner U. Boeglin et al. |
Communications
|
08 Jul 2004 |
165-v1 |
Memorandum of Understanding between the GlueX Collaboration, Jefferson Lab, and Carnegie Mellon University |
Alex R. Dzierba et al. |
Communications
|
08 Jul 2004 |
166-v1 |
Memorandum of Understanding between the GlueX Collaboration, Jefferson Lab, and Ohio University |
Daniel S. Carman et al. |
Communications
|
08 Jul 2004 |
161-v1 |
JLab preparations for upgrade, FY05 budget |
Elton Smith |
Budget
|
08 Jul 2004 |
130-v1 |
JLab preparations for upgrade, FY05 budget |
Elton Smith |
None
|
08 Jul 2004 |
104-v1 |
Detector for GlueX |
Elton Smith |
Presentation
|
08 Jul 2004 |
168-v1 |
Memorandum of Understanding between the GlueX Collaboration, Jefferson Lab, and The Catholic University of America |
Alex R. Dzierba et al. |
Communications
|
08 Jul 2004 |
375-v1 |
Preparing for the Lehman review |
Elton Smith |
None
|
13 Dec 2003 |
356-v1 |
R&D funding for FY2004 |
Elton Smith |
Budget
|
12 Dec 2003 |
32-v1 |
Hall D Beam Containment Proposal |
Lew Keller et al. |
Containment
|
21 Jun 2000 |
31-v1 |
High Rate Tests |
Elton Smith |
Beam Test
|
01 Jun 2000 |
Number of documents found: 51
DocDB Version 8.8.6, contact
Document Database Administrators
Execution time: 2 wallclock secs ( 0.84 usr + 0.23 sys = 1.07 CPU)