Difference between revisions of "Short Term Run Plan"
(→Run conditions) |
(→DAQ issues) |
||
(77 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
− | + | Do reload this page, it gets updated frequently. | |
− | + | ||
== Current Experiment == | == Current Experiment == | ||
− | + | Rare Eta Decay & GlueX II (with DIRC) | |
− | * Experiment number: E12- | + | * Experiment number: E12-12-002 (use in BTA shift information) |
− | * | + | * [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 Proposal] |
− | * Spokesperson: | + | * Spokesperson: C. A. Meyer |
== Notes == | == Notes == | ||
− | * | + | * All GlueX detectors (including DIRC) |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
== Run conditions == | == Run conditions == | ||
− | [https://halldweb.jlab.org/online/whiteboard/ Hall D counting room | + | [https://halldweb.jlab.org/online/whiteboard/ Hall D counting room whiteboard] |
− | * Radiator JD70-103 45 | + | * Radiator: JD70-103 50 um diamond (4 orientations: 0, 90, 45, -45) |
− | * Collimator | + | * Collimator: 5.0 mm |
− | * TPOL converter Be | + | * TPOL converter: Be 75 um |
− | * | + | * Runs are no more than 2 hours (~400M triggers)- see whiteboard for the production cycle |
+ | * Target: Liquid Hydrogen | ||
− | + | DAQ configuration | |
− | + | * Setup: FCAL_BCAL_PS_m9 | |
− | + | * Production: PHYSICS_DIRC | |
− | + | * (Raw mode: PHYSICS_DIRC_RAW) | |
− | + | ||
− | DAQ | + | |
− | * | + | |
− | * | + | |
− | * ( | + | |
== Run plan == | == Run plan == | ||
− | See the daily plan in [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings: | + | See the daily plan in [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023 Run Coordination Meetings:Spring2023] and also the [https://halldweb.jlab.org/online/whiteboard/ counting house whiteboard] |
== Shift duties == | == Shift duties == | ||
− | + | [[Shift_Guidelines_for_Shift_Leader|Shift Leader]] | |
− | + | [[Guidelines_for_Remote_Worker_Shift|Shift Worker]] | |
− | + | == Special instructions == | |
− | + | === Hall Delta === | |
− | + | It's good practice to refer to our hall as Delta when talking to MCC, to make sure that there is no acoustic confusion between us and Hall B. | |
− | + | === Screenshot tool === | |
− | + | ||
− | + | ||
− | + | "Alt L" brings up the [[Logbook_Screenshot_Tool | screenshot tool for making E-log entries]] | |
− | + | === FCAL Base lockup === | |
− | + | ||
− | + | ||
− | + | ||
− | + | If FCAL HV bases lose communication and stop providing high voltage, refer to https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift#FCAL_Base_lockup | |
− | + | === CDC Weather alarm === | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | aka Alarm on HD:coda:cdc:p_diff. | |
+ | See https://logbooks.jlab.org/entry/4117725 | ||
+ | * Stop run - Acknowledge alarm and document it - Start new run | ||
+ | We are temporarily using Hall B sensor for our alarm, see [https://logbooks.jlab.org/entry/4117725 Alternative Barometric Pressure Measurement] | ||
+ | <!--The alarm has been disabled, see logbook entries [https://logbooks.jlab.org/entry/4114344 4114344], [https://logbooks.jlab.org/entry/4114307 4114307]--> | ||
− | + | === DIRC Communication Error at Run Start === | |
− | + | When starting a new run, one of the DIRC FPGA boards may lose communication resulting in a Magenta communication error in the Alarm Tree, refer to [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift#DIRC_Communication_Error_at_run_start this page] for a fix. | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
=== After beam restoration === | === After beam restoration === | ||
− | * | + | * See [[Beam_Line_Detectors_Shift#Collimator_and_Radiators]] on how to move radiators and collimator |
* check the '''radiation levels''' without radiator and then with the radiator | * check the '''radiation levels''' without radiator and then with the radiator | ||
Line 98: | Line 68: | ||
* '''collimator in blocking position''' | * '''collimator in blocking position''' | ||
* ask MCC to do their harp scan | * ask MCC to do their harp scan | ||
− | * our '''harp scans''': follow the instructions in [[Beam_Line_Detectors_Shift#Radiator_Harp_Scan]] | + | * our '''harp scans''': follow the instructions in [[Beam_Line_Detectors_Shift#Radiator_Harp_Scan]] |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
=== rootspy === | === rootspy === | ||
Line 115: | Line 78: | ||
Call the expert. In case they suggest that you restart the DAQ, find information at [[Data_Acquisition_Shift]]. | Call the expert. In case they suggest that you restart the DAQ, find information at [[Data_Acquisition_Shift]]. | ||
− | + | In case the DAQ issue is '''low lifetime''': | |
+ | * In case there is time (eg beam down), call the expert so that he can track down the problem. | ||
+ | * Restart the DAQ, if that does not help, call the expert. | ||
− | + | === BTA sheet === | |
− | + | * The '''BTA''' guidelines are at [[BTA_guidelines]]. <br> After loading the EPICS values, you may change the values, eg round them up or down. | |
− | + | ** '''BANU values''' should be reflected in the PCC (or UED) value (else the aftermath doesnt work out for RC), put a comment for > 5minutes. | |
− | + | ** '''UED:''' unplanned experiment down (hardware failure). | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | === Bottom Alcohol Bubbler === | |
− | + | *We are not using the bottom alcohol bubbler. It is expected that its level is "ADD" and that it is not bubbling [https://logbooks.jlab.org/entry/4108449 log entry] | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + |
Latest revision as of 03:49, 13 February 2023
Do reload this page, it gets updated frequently.
Contents
Current Experiment
Rare Eta Decay & GlueX II (with DIRC)
- Experiment number: E12-12-002 (use in BTA shift information)
- Proposal
- Spokesperson: C. A. Meyer
Notes
- All GlueX detectors (including DIRC)
Run conditions
Hall D counting room whiteboard
- Radiator: JD70-103 50 um diamond (4 orientations: 0, 90, 45, -45)
- Collimator: 5.0 mm
- TPOL converter: Be 75 um
- Runs are no more than 2 hours (~400M triggers)- see whiteboard for the production cycle
- Target: Liquid Hydrogen
DAQ configuration
- Setup: FCAL_BCAL_PS_m9
- Production: PHYSICS_DIRC
- (Raw mode: PHYSICS_DIRC_RAW)
Run plan
See the daily plan in Run Coordination Meetings:Spring2023 and also the counting house whiteboard
Shift duties
Special instructions
Hall Delta
It's good practice to refer to our hall as Delta when talking to MCC, to make sure that there is no acoustic confusion between us and Hall B.
Screenshot tool
"Alt L" brings up the screenshot tool for making E-log entries
FCAL Base lockup
If FCAL HV bases lose communication and stop providing high voltage, refer to https://halldweb.jlab.org/hdops/wiki/index.php/Forward_Calorimeter_Shift#FCAL_Base_lockup
CDC Weather alarm
aka Alarm on HD:coda:cdc:p_diff. See https://logbooks.jlab.org/entry/4117725
- Stop run - Acknowledge alarm and document it - Start new run
We are temporarily using Hall B sensor for our alarm, see Alternative Barometric Pressure Measurement
DIRC Communication Error at Run Start
When starting a new run, one of the DIRC FPGA boards may lose communication resulting in a Magenta communication error in the Alarm Tree, refer to this page for a fix.
After beam restoration
- See Beam_Line_Detectors_Shift#Collimator_and_Radiators on how to move radiators and collimator
- check the radiation levels without radiator and then with the radiator
- see the whiteboard (bottom RHS corner of the RH board) - there are columns of values expected without and with the radiator
- retract the radiator
- collimator in blocking position
- ask MCC to do their harp scan
- our harp scans: follow the instructions in Beam_Line_Detectors_Shift#Radiator_Harp_Scan
rootspy
If you have to restart rootspy, Online_Monitoring_Shift#Routine_Operation, and it crashes, you might have to restart the monitoring process, find help at Online_Monitoring_Shift#Starting_and_stopping_the_Monitoring_System.
DAQ issues
Call the expert. In case they suggest that you restart the DAQ, find information at Data_Acquisition_Shift.
In case the DAQ issue is low lifetime:
- In case there is time (eg beam down), call the expert so that he can track down the problem.
- Restart the DAQ, if that does not help, call the expert.
BTA sheet
- The BTA guidelines are at BTA_guidelines.
After loading the EPICS values, you may change the values, eg round them up or down.- BANU values should be reflected in the PCC (or UED) value (else the aftermath doesnt work out for RC), put a comment for > 5minutes.
- UED: unplanned experiment down (hardware failure).
Bottom Alcohol Bubbler
- We are not using the bottom alcohol bubbler. It is expected that its level is "ADD" and that it is not bubbling log entry