Difference between revisions of "Hall D Runs"
From Hall D Ops Wiki
m (→Commissioning) |
|||
Line 27: | Line 27: | ||
*[[Spring 2015 Commissioning Plan | 2015 Spring Commissioning Plan]] | *[[Spring 2015 Commissioning Plan | 2015 Spring Commissioning Plan]] | ||
− | |||
**[https://halldweb.jlab.org/DocDB/0027/002712/001/Spring15_run_summary.pdf Summary report given at the GlueX collaboration meeting, May 2015.] | **[https://halldweb.jlab.org/DocDB/0027/002712/001/Spring15_run_summary.pdf Summary report given at the GlueX collaboration meeting, May 2015.] | ||
*[[Fall 2014 Commissioning Plan | 2014 Fall Commissioning Plan]] | *[[Fall 2014 Commissioning Plan | 2014 Fall Commissioning Plan]] | ||
**[https://halldweb.jlab.org/DocDB/0026/002649/001/Fall14_run_summary.pdf Fall 2014: Summary report given at the GlueX collaboration meeting, Feb. 2015.] | **[https://halldweb.jlab.org/DocDB/0026/002649/001/Fall14_run_summary.pdf Fall 2014: Summary report given at the GlueX collaboration meeting, Feb. 2015.] |
Revision as of 11:17, 17 January 2019
Running
- Fall 2018 GlueX Run
- [ Summary of the Fall 2018 run]
- [ Summary for the GlueX collaboration meeting, Feb. 2019.]
- Spring 2017 GlueX Run
- [ Summary of the Spring 2017 run]
- Summary for the GlueX collaboration meeting, Oct. 2017.
- Fall 2016 GlueX Run (Engineering)
Commissioning
- Spring 2016