2007-12-12

From GlueXWiki
Jump to: navigation, search

Meeting Connections

To connect from the outside by phone please do the following

1.) ESNET: 8242553

2.) EVO: Room has been booked for GlueX Weekly meeting

3.) Phone:

+1-800-377-8846 : US

+1-888-276-7715 : Canada

+1-302-709-8424 : International

then enter participant code: 39527048# (remember the "#")

Agenda

  • Announcements and Review Status
    • IPR CD-3 22-24 July, 2008
  • Reports from Technical Groups
    • Calorimetry
    • Offline Software
    • Tagger & Beamline
  • Review the R&D reports due in 2008
    • BCAL:
   Measure the light output for cosmic muons with the first
   prototype SiPMT arrays and verify it is above 20 photo electrons.
   Deadline for DOE: 30-Jun-08
    • Tagger:
   Develop a fabrication technique to build a prototype of the tagger
   microscope and couple it to a SiPMT.
   Deadline for DOE: 30-Jun-08
    • Electronics:
   Auxiliary electronics prototyping: Report summarizing the concept
   and prototyping of the clock distribution. The jitter of the clock should
   be below 50ps
   Deadline for DOE: 31-Aug-08
    • FADC:
   Complete fabrication and testing of prototype v1 of the
   master trigger module and collect signals from 2 energy sum modules in
   parallel at 2.5 Gbits/sec
   Deadline for DOE: 31-Aug-08
    • FDC:
   Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers.
   Verify the wire placement is in +/- 50u.
   Deadline for DOE: 30-Sep-08
    • UPV:
  need a solution till end of February, which needs to be summarized in a CR to the project management.
  The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports.
  • AOT: meetings between Xmas and New Year on the Portal's Calendar?