Run Planning Meeting Notes, April 24 - April 30, 2025

From GlueXWiki
Jump to: navigation, search

↑ Back to Run Coordination Meetings:Spring2025#Runplan



Tuesday April 29

Shift Crew Summaries

Reports

Issues

  • TRD removal date: Thu.
  • Incorrect fan tray used in swap yesterday; correcting today.
  • Gas bottle swaps in hall (He on GC, Ar)
  • Calibration factor adjustment on Tagger e- beam dump H2O conductivity.
  • All detectors: Check timing cuts/windows in preparation for production
  • hdmon occupancy stalls w/o reason

Plans

  • Upcoming Plans:
    • Full survey - Hall to Restricted access as soon as is practicable (Accommodating gas bottle swaps etc.)
    • Full survey - Tagger to Controlled access (Beam dump H2O conductivity cal. factor adjustment)


Monday April 28

Shift Crew Summaries

Reports

Issues

Plans

  • Upcoming Plans:
    • Diamond preparations
    • CDC preparations

Weekend April 26-April 28 (Owl)

Shift Crew Summaries

Reports

Saturday

Sunday / Mon Owl

Issues

Saturday

  • ECAL HVs unable to remote reset.
  • FDC input change unhelpful - gas mix change adjusted. MFC valves perhaps both require swap.

Sunday

  • Crate fan tray supporting FDC-5 failed; repair required. Bypassed in trigger for now.
  • VTPAD00B local controller reset to recover from error.
  • ECAL HVs unable to remote reset.
  • FADC swap in ROCECAL4.
  • FCAL reloads perhaps not restoring HV properly - monitor and use file if necessary

Monday Owl

  • ECAL HVs unable to remote reset.

Plans

  • Trigger commissioning

Friday April 25

Shift Crew Summaries

Reports

Issues

Plans

Thursday April 24

Shift Crew Summaries

Reports

Issues

Plans

Wednesday April 23

Shift Crew Summaries

Reports

    • Parasitic work / experiments:
      • EIC + MOLLER (how many people?)
      • Open the Hall gate
      • Disassemble parts, Crane use
      • SVT Test Stand/Telescope Removal
      • Change Management Video production (Doug H.++)
      • Wrap up by pm

Issues

Plans

Tuesday April 22

Shift Crew Summaries

Reports

Issues

Plans

  • Maintenance day:
    • SAF113 training (8+1 person)
    • Radcon survey for Restricted Access
    • Parasitic experiments
      • EIC + MOLLER (how many people?)
      • open the Hall gate
      • Dissasemble parts, Crane use
      • need to wrap up by 3-4pm

Previous RC


On-going Plans

  • Short term run plan
    • highest priority: ECAL+FCAL+BCAL trigger preparing for pi0 production
    • Diamond alignment
    • Production: pi0 running
    • anything else?