  • Here is a diagram made by Chris Cuevas of the cabling for the BCAL test. This focuses mainly on what is needed in
    5 KB (835 words) - 15:55, 29 August 2006
  • ...0ns and 250->310ns. The longer, actual length is to our advantage. Chris Cuevas will assit in getting a fast trigger cable from the tagger MOR to the Alcov
    4 KB (618 words) - 11:43, 1 August 2006
  • Cuevas.
    2 KB (326 words) - 11:59, 11 April 2007
  • Chris Cuevas has arranged for someone in the Accelerator Group
    1 KB (165 words) - 11:57, 11 April 2007
  • on a g10 backing. Brian (and Chris Cuevas) believe that this will
    3 KB (389 words) - 11:56, 11 April 2007
  • ink for the FDC ground planes. Chris Cuevas has no real preference
    2 KB (336 words) - 11:55, 11 April 2007
  • with Chris Cuevas and Elton regarding who will work on the FDC
    1 KB (206 words) - 11:53, 11 April 2007
  • tests. He has been in communication with Chris Cuevas who will
    2 KB (346 words) - 11:51, 11 April 2007
  • DSC reported that he had talked to Chris Cuevas about modifications
    6 KB (986 words) - 12:43, 7 December 2006
  • DSC reported that he had talked to Chris Cuevas about modifications
    6 KB (976 words) - 12:04, 11 April 2007
  • called HVPF that Chris Cuevas was talking about for Hall B. This
    5 KB (821 words) - 09:06, 12 April 2007
  • will discuss this with Chris Cuevas at some point and will look
    4 KB (639 words) - 09:07, 12 April 2007
  • ...nline_9Aug07.ppt Role of JLab Electronics group in Hall D online] - Chris Cuevas
    5 KB (870 words) - 13:55, 27 August 2007
  • '''Chris Cuevas gave an update on electronics:'''
    4 KB (638 words) - 12:39, 14 March 2017
  • '''Chris Cuevas showed the latest electronics diagrams'''
    5 KB (712 words) - 15:31, 6 February 2008
  • * Introduction to ATCA (see [[Media:Chris_ATCA_15Feb08.ppt]])- Chris Cuevas
    4 KB (629 words) - 15:10, 27 February 2008
  • Trigger Network System drawings posted by Chris Cuevas
    2 KB (254 words) - 12:40, 14 March 2017
  • #* Discussion with C. Cuevas & Co.
    6 KB (892 words) - 17:14, 24 February 2017
  • we can get manpower if needed through Chris Cuevas' group so that delays
    9 KB (1,520 words) - 17:12, 24 February 2017
  • Cuevas' group so that delays on the wire board Phase 2 soldering and
    10 KB (1,597 words) - 17:14, 24 February 2017