Difference between revisions of "JEF meeting, February 16, 2024"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 37: | Line 37: | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6347 Rough draft of Feb. collaboration talk] -- Simon | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6347 Rough draft of Feb. collaboration talk] -- Simon | ||
+ | ** [https://halldweb.jlab.org/wiki/images/1/1e/Glue-jefxd-igal-jaegle-16042024.pdf updates] -- ig |
Revision as of 10:52, 16 February 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV cables: received 165 cables 1445 in total
- - HV distribution boards: in preparation
- - LV cables: 100 cables received, 250 cables in total
- - LV distribution boards. Received 4 boards, performed initial cehck, need to solder connectors [2]
- - Optical fibers and parts for the trigger/DAQ have been ordered
- Ongoing projects -- Sasha, all
- - Testing and labeling cables, 100 short LV cables tested and labeled during this week.
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections)
- - Radiation tests of the PMT active base [5]
- Finished tests, working on the tech note
- - Inventory database and GUI for installed electronics
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / George
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad
- Analysis/Simulation
- Rough draft of Feb. collaboration talk -- Simon
- updates -- ig