*'''Preparation of parts for ECAL''' -- Sasha | *'''Preparation of parts for ECAL''' -- Sasha | ||
− | ** - signal cables | + | ** - signal cables and 2 patch panels [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ] - done |
− | + | ** - HV short cables: done | |
− | ** - HV short cables: | + | |
** - HV long cable, 18 ready (out of 36) | ** - HV long cable, 18 ready (out of 36) | ||
− | ** - HV distribution boards: | + | ** - HV distribution boards: not designed |
− | ** - LV cables: | + | ** - LV cables: missing about 20 cables, waiting for the last delivery batch. |
− | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. | + | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready |
− | ** - | + | ** - LED: the prototype of the LED board has been received. Chris will populate it with components |
* '''Ongoing projects''' | * '''Ongoing projects''' | ||
− | |||
** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] | ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] | ||
+ | ** - Testing, labeling and bundling LV cables | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | ||
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ||
− | |||
** - All dividers have been fabricated and tested by George [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers] | ** - All dividers have been fabricated and tested by George [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers] | ||
− | *** | + | *** Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers) |
− | + | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
− | + | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4300430] [https://logbooks.jlab.org/entry/4299442] | |
− | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/ | + | |
− | + | ||
− | + | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]) | *** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]) | ||
− | ** ''' | + | * '''Summer students''' -- Sasha |
− | *** measure shower beam profile | + | ** - 2 students from UNCW (May 15), 1 student from GWU (May 19) All paper work has been completed, they are ready to come. |
− | *** | + | ** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots |
− | + | * '''Beam tests with the PS''' | |
− | ** | + | *** measure shower beam profile and reconstruction in the crystal/LG transition region |
− | + | *** (install prototype with 5x5 PbWO4 modules + ? LG) | |
+ | * '''Other hardware projects''' | ||
+ | ** prototype of the ECAL veto counter (?) | ||
*'''FCAL2 poster for open house?''' | *'''FCAL2 poster for open house?''' | ||
− | ** JEF/ECAL/FCAL poster | + | ** JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us) |
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' |
Revision as of 08:59, 10 May 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables and 2 patch panels [1] - done
- - HV short cables: done
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: not designed
- - LV cables: missing about 20 cables, waiting for the last delivery batch.
- - LV distribution boards [2]. One board out of 4 is ready
- - LED: the prototype of the LED board has been received. Chris will populate it with components
- Ongoing projects
- - Update from Laveen
- - Testing, labeling and bundling LV cables
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Summer students -- Sasha
- - 2 students from UNCW (May 15), 1 student from GWU (May 19) All paper work has been completed, they are ready to come.
- - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us)