*'''Preparation of parts for ECAL''' -- Sasha  
 
*'''Preparation of parts for ECAL''' -- Sasha  
** - signal cables and 2 patch panels [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ] - done
+
** - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
** - HV short cables: done
+
** - HV distribution boards: has not yet been designed, need 4 boards
** - HV long cable, 18 ready (out of 36)  
+
** - HV distribution boards: not designed
+
 
** - LV cables: missing about 20 cables, waiting for the last delivery batch.
 
** - LV cables: missing about 20 cables, waiting for the last delivery batch.
** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready
+
** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready, using for testing dividers
** - LED: the prototype of the LED board has been received. Chris will populate it with components
+
** - LED: prototype board is ready, have to start testing
* '''Ongoing projects'''  
+
* '''Ongoing projects''' - All
 
**  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen]
 
**  - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen]
**  - Testing, labeling and bundling LV cables
 
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy
 
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
 
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
Line 19: Line 16:
 
***  Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
 
***  Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4300430] [https://logbooks.jlab.org/entry/4299442]
+
** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4308819] [https://logbooks.jlab.org/entry/4308979]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg])
 
 
* '''Summer students''' -- Sasha
 
* '''Summer students''' -- Sasha
** - 2 students from UNCW (May 15), 1 student from GWU (May 19) All paper work has been completed, they are ready to come.
+
** - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
 
** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
 
** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
 
* '''Beam tests with the PS'''
 
* '''Beam tests with the PS'''
Line 32: Line 28:
 
*'''FCAL2 posters for open house'''
 
*'''FCAL2 posters for open house'''
 
** JEF/ECAL/FCAL poster  (Laveen + students + feedback from all of us)  
 
** JEF/ECAL/FCAL poster  (Laveen + students + feedback from all of us)  
** [https://halldweb.jlab.org/wiki/images/2/2c/1-OH24Poster-V-LAVEEN-revised.pdf | JEF physics poster] (Laveen)
+
** [https://halldweb.jlab.org/wiki/images/2/2c/1-OH24Poster-V-LAVEEN-revised.pdf JEF physics poster] (Laveen)
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''

Revision as of 23:14, 23 May 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
    • - HV distribution boards: has not yet been designed, need 4 boards
    • - LV cables: missing about 20 cables, waiting for the last delivery batch.
    • - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers
    • - LED: prototype board is ready, have to start testing
  • Ongoing projects - All
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - Testing procedure [2]
    • - All dividers have been fabricated and tested by George [3]
      • Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
  • Summer students -- Sasha
    • - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
    • - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
  • FCAL2 posters for open house
    • JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us)
    • JEF physics poster (Laveen)
  • Analysis/Simulation