Difference between revisions of "2012-10-17"
From GlueXWiki
(→MOU and Contract Status) |
(→Reports from Technical Groups) |
||
Line 43: | Line 43: | ||
** Calorimetry [[Sep 11, 2012 Calorimetry|September 11, 2012]] | ** Calorimetry [[Sep 11, 2012 Calorimetry|September 11, 2012]] | ||
** BCAL Readout [[Sep 18, 2012 Readout|September 18, 2012]] | ** BCAL Readout [[Sep 18, 2012 Readout|September 18, 2012]] | ||
− | |||
* Tracking [[September 12, 2012 tracking CDC/FDC| September 12, 2012]] | * Tracking [[September 12, 2012 tracking CDC/FDC| September 12, 2012]] | ||
** CDC | ** CDC | ||
** FDC | ** FDC | ||
− | |||
* PID | * PID | ||
** TOF [[GlueX TOF Meeting, September 13, 2012|September 13, 2012]] | ** TOF [[GlueX TOF Meeting, September 13, 2012|September 13, 2012]] | ||
** Start Counter [[GlueX Start Counter Meeting, August 23, 2012#Minutes|August 23, 2012]] | ** Start Counter [[GlueX Start Counter Meeting, August 23, 2012#Minutes|August 23, 2012]] | ||
** PID Upgrades [[September 17, 2012 PID Upgrade|September 17, 2012]] | ** PID Upgrades [[September 17, 2012 PID Upgrade|September 17, 2012]] | ||
− | |||
* Engineering | * Engineering | ||
** Magnet | ** Magnet | ||
** Target | ** Target | ||
** Engineering Activities | ** Engineering Activities | ||
− | |||
* Electronics | * Electronics | ||
** Technical Design Report | ** Technical Design Report | ||
* Trigger [[OWG Meeting 12-Sep-2012 |September 12, 2012]] | * Trigger [[OWG Meeting 12-Sep-2012 |September 12, 2012]] | ||
− | |||
* DAQ/Monitoring/Controls [[OWG Meeting 12-Sep-2012 |September 12, 2012]] | * DAQ/Monitoring/Controls [[OWG Meeting 12-Sep-2012 |September 12, 2012]] | ||
− | |||
* Offline | * Offline | ||
** Software Meeting [[GlueX Offline Meeting, September 5, 2012#Minutes|September 5, 2012]] | ** Software Meeting [[GlueX Offline Meeting, September 5, 2012#Minutes|September 5, 2012]] | ||
** Data Challenge [[GlueX Data Challenge Meeting, September 10, 2012|September 10, 2012]] | ** Data Challenge [[GlueX Data Challenge Meeting, September 10, 2012|September 10, 2012]] | ||
− | |||
* Photon Beam and Tagger [[BLTWG Meeting 09/17/2012|September 17, 2012]] | * Photon Beam and Tagger [[BLTWG Meeting 09/17/2012|September 17, 2012]] | ||
− | |||
* Physics [[September 10, 2012 (11:30AM), Physics Working Group|September 10, 2012]] | * Physics [[September 10, 2012 (11:30AM), Physics Working Group|September 10, 2012]] | ||
=== AOT === | === AOT === |
Revision as of 14:11, 16 October 2012
Contents
Meeting Time and Place
The meeting will be on Wednesday October 17, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
Announcements
MOU and Contract Status
- MOU Status
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
- UCONN
Technical Design Report
Reports from Technical Groups
- Calorimeters
- Beam Tests
- Calorimetry September 11, 2012
- BCAL Readout September 18, 2012
- Tracking September 12, 2012
- CDC
- FDC
- PID
- TOF September 13, 2012
- Start Counter August 23, 2012
- PID Upgrades September 17, 2012
- Engineering
- Magnet
- Target
- Engineering Activities
- Electronics
- Technical Design Report
- Trigger September 12, 2012
- DAQ/Monitoring/Controls September 12, 2012
- Offline
- Software Meeting September 5, 2012
- Data Challenge September 10, 2012
- Photon Beam and Tagger September 17, 2012
- Physics September 10, 2012