− | ** BCAL [http://www.jlab.org/Hall-D/software/wiki/index.php/BCAL_SiPM_Tests_2007#JLab A20H SiPM Tests] | + | ** BCAL [http://www.jlab.org/Hall-D/software/wiki/index.php/BCAL_SiPM_Tests_2007#JLab A20H SiPM Tests] [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=926 SiPM-array tests udner Phase I] |
** TOF | ** TOF | ||
** FCAL | ** FCAL |
Revision as of 08:56, 12 December 2007
Meeting Connections
To connect from the outside by phone please do the following
1.) ESNET: 8242553
2.) EVO: Room has been booked for GlueX Weekly meeting
3.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")
Agenda
- Announcements and Review Status
- IPR CD-3 22-24 July, 2008
- Collaboration Meeting in January GlueX-Collaboration-Jan-2008
- Reports from Technical Groups
- Calorimetry
- Offline Software
- Tagger & Beamline
- Detector Updates
- Beamline & Tagger
- Solenoid
- Target
- Start Counter
- CDC CDC_12_12_2007
- FDC
- BCAL A20H SiPM Tests SiPM-array tests udner Phase I
- TOF
- FCAL
- Electronics
- Online
- Offline
- Monte Carlo
- Review the R&D reports due in 2008
- BCAL:
Measure the light output for cosmic muons with the first prototype SiPMT arrays and verify it is above 20 photo electrons. Deadline for DOE: 30-Jun-08
- Tagger:
Develop a fabrication technique to build a prototype of the tagger microscope and couple it to a SiPMT. Deadline for DOE: 30-Jun-08
- Electronics:
Auxiliary electronics prototyping: Report summarizing the concept and prototyping of the clock distribution. The jitter of the clock should be below 50ps Deadline for DOE: 31-Aug-08
- FADC:
Complete fabrication and testing of prototype v1 of the master trigger module and collect signals from 2 energy sum modules in parallel at 2.5 Gbits/sec Deadline for DOE: 31-Aug-08
- FDC:
Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers. Verify the wire placement is in +/- 50u. Deadline for DOE: 30-Sep-08
- UPV:
need a solution till end of February, which needs to be summarized in a CR to the project management. The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports.
- Review of action items listed in action item tracker at http://www.jlab.org/~elke/ActionItemTrackerHallD.xls
- AOT