Difference between revisions of "May 5, 2008 Calorimetry"
From GlueXWiki
(→Minutes) |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 20: | Line 20: | ||
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton) | #* [[Private:Fiber Specs | Fiber Specifications]] (Elton) | ||
#* Fiber Testing (evaluation, production) | #* Fiber Testing (evaluation, production) | ||
− | # FCAL Update | + | # FCAL Update |
+ | #* [http://www.jlab.org/Hall-D/software/wiki/images/5/5e/FADC_Maj2008a.pdf FADC time resolution measurement] (Mihajlo) | ||
# Calibration system update (Christina) | # Calibration system update (Christina) | ||
#* [[Calibration-Monitoring]] | #* [[Calibration-Monitoring]] | ||
Line 31: | Line 32: | ||
=Minutes= | =Minutes= | ||
− | + | Participants: Elton, Beni, ELke, Christina, Matt. Mihajlo, John, Zisis, Andrei, George | |
# BCAL | # BCAL | ||
#* Report on the visit to Alberta [[Media:UofAMeeting080429.pdf]]; increased role of Alberta; scheduling on the CNC machine | #* Report on the visit to Alberta [[Media:UofAMeeting080429.pdf]]; increased role of Alberta; scheduling on the CNC machine | ||
− | #* Fiber specs: Elton update the specs on the DocDB ([ | + | #* Fiber specs: Elton update the specs on the DocDB ([https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=920]) with all comments he received. It can be sent on to procurement to prepare for a bid package. Regina findings in connection to the manufacturer's claim of fiber spectral response and no of photons produced per MeV were discussed. A NIM article is in preparation. |
− | #* Fiber | + | #* Fiber Testing: new parallel setup at JLab, absolute light output measurement, to accommodate SiPM in one line and fibers in the other. |
− | # FCAL | + | # FCAL: see link above to presentation for the collaboration meeting. We need VXS compatibility. |
# Calibration and Monitoring (see link above). | # Calibration and Monitoring (see link above). | ||
# Collaboration Meeting Preparations | # Collaboration Meeting Preparations | ||
− | #* FCAL | + | #* FCAL: 25 min; see above (Mihajlo will present); will go after Calibration and before BCAL. |
− | #* BCAL | + | #* BCAL: two sessions totaling 40 min each; Elton will contact Curtis to change agenda and use Electronics time for the calorimetry section. Carl will need 30 min, and Calorimetry Review final report discussion (30 min). |
− | #* Calibration | + | #* Calibration: 10 min plus a summary slide of detector requirements. We will start with Calibration. |
− | #* Monte Carlo | + | #* Monte Carlo: Zisis will contact David and present standalone BCAL stuff during the Thu afternoon session. |
− | # Other business | + | # Other business: Fall collaboration meeting dates should be fixed at next week's meeting. |
Latest revision as of 17:12, 24 February 2017
Connection
- The meeting will be held at 10:30 am ET
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: April 21, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
- Schedule
Agenda
- BCAL Update
- Report on the visit to Alberta (George/Zisis)
- Fiber Specifications (Elton)
- Fiber Testing (evaluation, production)
- FCAL Update
- FADC time resolution measurement (Mihajlo)
- Calibration system update (Christina)
- Collaboration meeting On the schedule we have 1:15 min (what do we want to report? who?)
- FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
- BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
- Calibration:
- Monte Carlo:
- Any other business
Minutes
Participants: Elton, Beni, ELke, Christina, Matt. Mihajlo, John, Zisis, Andrei, George
- BCAL
- Report on the visit to Alberta Media:UofAMeeting080429.pdf; increased role of Alberta; scheduling on the CNC machine
- Fiber specs: Elton update the specs on the DocDB ([1]) with all comments he received. It can be sent on to procurement to prepare for a bid package. Regina findings in connection to the manufacturer's claim of fiber spectral response and no of photons produced per MeV were discussed. A NIM article is in preparation.
- Fiber Testing: new parallel setup at JLab, absolute light output measurement, to accommodate SiPM in one line and fibers in the other.
- FCAL: see link above to presentation for the collaboration meeting. We need VXS compatibility.
- Calibration and Monitoring (see link above).
- Collaboration Meeting Preparations
- FCAL: 25 min; see above (Mihajlo will present); will go after Calibration and before BCAL.
- BCAL: two sessions totaling 40 min each; Elton will contact Curtis to change agenda and use Electronics time for the calorimetry section. Carl will need 30 min, and Calorimetry Review final report discussion (30 min).
- Calibration: 10 min plus a summary slide of detector requirements. We will start with Calibration.
- Monte Carlo: Zisis will contact David and present standalone BCAL stuff during the Thu afternoon session.
- Other business: Fall collaboration meeting dates should be fixed at next week's meeting.