Difference between revisions of "JEF meeting, December 16, 2022"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only *Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142]...") |
m (→Minutes) |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
=Agenda= | =Agenda= | ||
+ | |||
*'''Preparation of parts for FCAL2 modules''' -- Sasha | *'''Preparation of parts for FCAL2 modules''' -- Sasha | ||
+ | ** Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 815 ] | ||
+ | *** 20 crystals wrapped during last week | ||
+ | *** Available for wrapping: 10 crystals | ||
+ | *** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 1378 </span> (7 modules fabricated since last week) | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 802 CRYTUR], available: 23 | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | * '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | ||
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak | * '''Installation of the FCAL2 detector''' -- Sasha / Arshak | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/November_16,_2022_FCAL_Insert_Installation_Meeting] | ||
+ | ** Detector cabling and patch panels for the FCAL insert | ||
+ | ** Manpower and division of tasks | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
* '''Light Monitoring System''' -- Arshak | * '''Light Monitoring System''' -- Arshak | ||
* '''Simulations/Analysis''' | * '''Simulations/Analysis''' | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Sasha, Igal, Joerg, Malte, Phil, Zisis, Igor, Jane, Olga, Susan, Eugene, Bill, S.T. | ||
+ | * Waiting for last 10 Crytur crystals from physics divison | ||
+ | * Expect final batch of 75 Crytur crystals in May | ||
+ | * Crystal wrapping and wire soldering by Mindy of detector support group continues | ||
+ | * Grand total of fabricated modules = 1378 | ||
+ | ** Starting to move crystals to new area in EEL building | ||
+ | * Sasha met with Fernando regarding PMT divider order and other divider details | ||
+ | ** 1 PMT/divider for bench tests with/without amplifier: noise test in FCAL dark room, no big issues found | ||
+ | ** NPS added RF filter to their divider design due to high noise levels -- not needed for our lower-gain design | ||
+ | ** Will order high lead-time divider components in anticipation of full order early next year | ||
+ | ** Chris S. to make PCB prototype | ||
+ | ** Discussed possibility of replacing unshielded ribbon cables with shielded ones | ||
+ | ** Make 5x5 prototype to test in hall during GlueX run in January/Februrary? | ||
+ | ** Sasha to work on GW contract, send dividers in February | ||
+ | *Student lodging for summer | ||
+ | ** Arranging housing through Hall D administrative support | ||
+ | ** Need to be aware that ResFac will be booked for Hugs for a couple of weeks (early June?) |
Latest revision as of 14:44, 16 December 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year
- Wrapped CRYTUR crystals: 815
- 20 crystals wrapped during last week
- Available for wrapping: 10 crystals
- Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1378 (7 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [1]
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Light Monitoring System -- Arshak
- Simulations/Analysis
Minutes
Attendees: Sasha, Igal, Joerg, Malte, Phil, Zisis, Igor, Jane, Olga, Susan, Eugene, Bill, S.T.
- Waiting for last 10 Crytur crystals from physics divison
- Expect final batch of 75 Crytur crystals in May
- Crystal wrapping and wire soldering by Mindy of detector support group continues
- Grand total of fabricated modules = 1378
- Starting to move crystals to new area in EEL building
- Sasha met with Fernando regarding PMT divider order and other divider details
- 1 PMT/divider for bench tests with/without amplifier: noise test in FCAL dark room, no big issues found
- NPS added RF filter to their divider design due to high noise levels -- not needed for our lower-gain design
- Will order high lead-time divider components in anticipation of full order early next year
- Chris S. to make PCB prototype
- Discussed possibility of replacing unshielded ribbon cables with shielded ones
- Make 5x5 prototype to test in hall during GlueX run in January/Februrary?
- Sasha to work on GW contract, send dividers in February
- Student lodging for summer
- Arranging housing through Hall D administrative support
- Need to be aware that ResFac will be booked for Hugs for a couple of weeks (early June?)