Line 19: | Line 19: | ||
* Announcements and Review Status | * Announcements and Review Status | ||
+ | ** IPR CD-3 22-24 July, 2008 | ||
− | * | + | * Collaboration Meeting in January [[GlueX-Collaboration-Jan-2008]] |
− | + | ||
− | *** BCAL: | + | * Reports from Technical Groups |
+ | ** Calorimetry | ||
+ | ** Offline Software | ||
+ | ** Tagger & Beamline | ||
+ | |||
+ | * Detector Updates | ||
+ | ** Beamline & Tagger | ||
+ | ** Solenoid | ||
+ | ** Target | ||
+ | ** Start Counter | ||
+ | ** CDC [[CDC_12_12_2007]] | ||
+ | ** FDC | ||
+ | ** BCAL [http://www.jlab.org/Hall-D/software/wiki/index.php/BCAL_SiPM_Tests_2007#JLab A20H SiPM Tests], [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=926 SiPM-array tests under Phase I] | ||
+ | ** TOF | ||
+ | ** FCAL | ||
+ | ** Electronics: establish Hall-D electronics pool | ||
+ | ** Online | ||
+ | ** Offline | ||
+ | ** Monte Carlo [[Status Report on CD3 simulation geometry]] | ||
+ | ** DAQ & Trigger | ||
+ | ** Calibration | ||
+ | |||
+ | * Review the R&D reports due in 2008 | ||
+ | ** BCAL: | ||
Measure the light output for cosmic muons with the first | Measure the light output for cosmic muons with the first | ||
prototype SiPMT arrays and verify it is above 20 photo electrons. | prototype SiPMT arrays and verify it is above 20 photo electrons. | ||
Deadline for DOE: 30-Jun-08 | Deadline for DOE: 30-Jun-08 | ||
− | + | ** Tagger: | |
− | + | ||
Develop a fabrication technique to build a prototype of the tagger | Develop a fabrication technique to build a prototype of the tagger | ||
microscope and couple it to a SiPMT. | microscope and couple it to a SiPMT. | ||
Deadline for DOE: 30-Jun-08 | Deadline for DOE: 30-Jun-08 | ||
− | + | ** Electronics: | |
− | + | ||
Auxiliary electronics prototyping: Report summarizing the concept | Auxiliary electronics prototyping: Report summarizing the concept | ||
and prototyping of the clock distribution. The jitter of the clock should | and prototyping of the clock distribution. The jitter of the clock should | ||
be below 50ps | be below 50ps | ||
Deadline for DOE: 31-Aug-08 | Deadline for DOE: 31-Aug-08 | ||
− | + | ** FADC: | |
− | + | Complete fabrication and testing of prototype v1 of the | |
master trigger module and collect signals from 2 energy sum modules in | master trigger module and collect signals from 2 energy sum modules in | ||
parallel at 2.5 Gbits/sec | parallel at 2.5 Gbits/sec | ||
Deadline for DOE: 31-Aug-08 | Deadline for DOE: 31-Aug-08 | ||
− | + | ** FDC: | |
− | + | ||
Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers. | Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers. | ||
Verify the wire placement is in +/- 50u. | Verify the wire placement is in +/- 50u. | ||
Deadline for DOE: 30-Sep-08 | Deadline for DOE: 30-Sep-08 | ||
+ | ** UPV: | ||
+ | need a solution till end of February, which needs to be summarized in a CR to the project management. | ||
+ | The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports. | ||
− | * | + | * Review of action items listed in action item tracker at http://www.jlab.org/~elke/ActionItemTrackerHallD.xls |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | * AOT | + | * AOT: meetings between Xmas and New Year on the Portal's Calendar? |
Latest revision as of 17:12, 24 February 2017
Meeting Connections
To connect from the outside by phone please do the following
1.) ESNET: 8242553
2.) EVO: Room has been booked for GlueX Weekly meeting
3.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")
Agenda
- Announcements and Review Status
- IPR CD-3 22-24 July, 2008
- Collaboration Meeting in January GlueX-Collaboration-Jan-2008
- Reports from Technical Groups
- Calorimetry
- Offline Software
- Tagger & Beamline
- Detector Updates
- Beamline & Tagger
- Solenoid
- Target
- Start Counter
- CDC CDC_12_12_2007
- FDC
- BCAL A20H SiPM Tests, SiPM-array tests under Phase I
- TOF
- FCAL
- Electronics: establish Hall-D electronics pool
- Online
- Offline
- Monte Carlo Status Report on CD3 simulation geometry
- DAQ & Trigger
- Calibration
- Review the R&D reports due in 2008
- BCAL:
Measure the light output for cosmic muons with the first prototype SiPMT arrays and verify it is above 20 photo electrons. Deadline for DOE: 30-Jun-08
- Tagger:
Develop a fabrication technique to build a prototype of the tagger microscope and couple it to a SiPMT. Deadline for DOE: 30-Jun-08
- Electronics:
Auxiliary electronics prototyping: Report summarizing the concept and prototyping of the clock distribution. The jitter of the clock should be below 50ps Deadline for DOE: 31-Aug-08
- FADC:
Complete fabrication and testing of prototype v1 of the master trigger module and collect signals from 2 energy sum modules in parallel at 2.5 Gbits/sec Deadline for DOE: 31-Aug-08
- FDC:
Develop the fabrication technique for winding full-scale wire planes of the Forward Drift Chambers. Verify the wire placement is in +/- 50u. Deadline for DOE: 30-Sep-08
- UPV:
need a solution till end of February, which needs to be summarized in a CR to the project management. The current situation with no progress, for a good reason will impact soon our performance reporting and trigger variance reports.
- Review of action items listed in action item tracker at http://www.jlab.org/~elke/ActionItemTrackerHallD.xls
- AOT: meetings between Xmas and New Year on the Portal's Calendar?