Difference between revisions of "2014-09-03"
From GlueXWiki
(→Reports from Technical Groups) |
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki") |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 21: | Line 21: | ||
* [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] October 2-4, 2014 | * [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] October 2-4, 2014 | ||
* Solenoid | * Solenoid | ||
+ | * [http://www.jlab.org/exp_prog/PACpage/PAC42/PAC42_FINAL_Report.pdf PAC 42 Report] | ||
=== Running in Fall 2014 === | === Running in Fall 2014 === | ||
Line 29: | Line 30: | ||
** Analysis Coordinator - Volker Crede or designate from Physics group | ** Analysis Coordinator - Volker Crede or designate from Physics group | ||
* Plans | * Plans | ||
− | ** [https:// | + | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan] |
− | ** [https:// | + | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan] |
− | ** [https:// | + | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning] |
** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below) | ** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below) | ||
* Manpower | * Manpower | ||
Line 40: | Line 41: | ||
* Technical Construction Report | * Technical Construction Report | ||
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ||
− | **[https:// | + | **[https://halldweb.jlab.org/wiki/index.php/StatusTable TCR Status] |
− | + | ||
− | + | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
Line 74: | Line 73: | ||
* Photon Beam and Tagger [[BLTWG Meeting 08/18/2014|August 18, 2014]] | * Photon Beam and Tagger [[BLTWG Meeting 08/18/2014|August 18, 2014]] | ||
* Physics [[August 25, 2014, Physics Working Group|August 25, 2014]] | * Physics [[August 25, 2014, Physics Working Group|August 25, 2014]] | ||
+ | ** [[Solenoid Current Studies]] | ||
+ | ** [https://www.dropbox.com/s/0p1iuhpnc4ialzu/GlueXCurrentStudies.xlsx?dl=0 Excel File] |
Latest revision as of 17:54, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday September 3, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Readiness Review August 26-28, 2014
- Collaboration Meeting October 2-4, 2014
- Solenoid
- PAC 42 Report
Running in Fall 2014
- Coordination
- Run Coordinator - Alexandre Deur
- Physics Division Liaison - Yi Qiang
- Shift Scheduler - Reinhard Schumacher
- Analysis Coordinator - Volker Crede or designate from Physics group
- Plans
- Manpower
- Shift Schedule site available.
- Schedule October now.
Ongoing Activities
- Technical Construction Report
Reports from Technical Groups
- Calorimeters: August 28, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction August 21, 2014
- Tracking Joint FDC/CDC Meeting August 28, 2014
- CDC
- FDC
- FADC FPGA September 2, 2014
- PID
- TOF September 2, 2014
- Start Counter August 21, 2014
- PID Upgrades August 29, 2014
- DAQ/Monitoring/Controls August 13, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) August 13, 2014
- Software (Level-3) September 2, 2014
- Offline Software
- Offline August 20, 2014
- Calibration August 27, 2014
- Photon Beam and Tagger August 18, 2014