Difference between revisions of "JEF meeting, May 3, 2024"
From GlueXWiki
Line 2: | Line 2: | ||
*9:30 am EST (JLab time) remote only | *9:30 am EST (JLab time) remote only | ||
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | ||
− | |||
*'''Preparation of parts for ECAL''' -- Sasha | *'''Preparation of parts for ECAL''' -- Sasha | ||
+ | ** - signal cables - done | ||
+ | ** - signal patch panel [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ] - done | ||
+ | ** - HV short cables: received, checked, labeled (last week) | ||
+ | ** - HV long cable, 18 ready (out of 36) | ||
+ | ** - HV distribution boards: in preparation | ||
+ | ** - LV cables: waiting for about 160 cables (will need to test, label, and bundle) | ||
+ | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. Have to populate with connectors, and design a box around the PCB | ||
+ | ** - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well | ||
* '''Ongoing projects''' | * '''Ongoing projects''' | ||
+ | ** - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024] | ||
+ | ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_26_2024/Status-Report-Laveen.pdf Update from Laveen] | ||
+ | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | ||
+ | ** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ||
+ | ** - Mindy has finished with preparing all sockets (~1650) ! | ||
+ | ** - All dividers have been fabricated | ||
+ | ** - Need to remove power regulators on about 200 dividers | ||
+ | ** - George has tested about 1400 dividers [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers]. | ||
+ | ** - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers) | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
+ | ** Submitted ePAS for testing installed dividers | ||
+ | ** <span style="color: red"> Installation of the LMS has been completed </span> [https://logbooks.jlab.org/entry/4282307] | ||
+ | ** Cable and divider installation [https://logbooks.jlab.org/entry/4288219] | ||
+ | *** Install cable bundles on vertical chains | ||
+ | *** Sort out dividers, set up jumpers (amplifier/by-pass) a]nd install them. | ||
+ | ** Two optical patch panels for the trigger distribution installed (Armen and Mark) [https://logbooks.jlab.org/entry/4288385] [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/optical_trigger.jpg] | ||
+ | ** Ethernet switch installed [https://logbooks.jlab.org/entry/4287964] | ||
+ | ** Connecting crates to the switch | ||
+ | ** Preparing for testing installed dividers | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | *** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]) | ||
** '''Other hardware projects''' | ** '''Other hardware projects''' | ||
+ | *** --prototype of the ECAL veto counter | ||
+ | *** --study shower profile using PS (also transition region between lead tungstate and LG modules (?) ) | ||
+ | *'''FCAL2 poster for open house?''' | ||
+ | ** JEF/ECAL/FCAL poster | ||
+ | ** exhibit stand (modules, PMTs, etc.) | ||
+ | |||
+ | |||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
** [https://halldweb.jlab.org/wiki/images/9/93/Glue-jefxd-igal-jaegle-03052024.pdf eta to ggpi0's update] -- ig | ** [https://halldweb.jlab.org/wiki/images/9/93/Glue-jefxd-igal-jaegle-03052024.pdf eta to ggpi0's update] -- ig |
Revision as of 08:58, 3 May 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: waiting for about 160 cables (will need to test, label, and bundle)
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well
- Ongoing projects
- - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (36 layers done, waiting for cables) [3]
- - Update from Laveen
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- - Testing procedure [4]
- - Mindy has finished with preparing all sockets (~1650) !
- - All dividers have been fabricated
- - Need to remove power regulators on about 200 dividers
- - George has tested about 1400 dividers [5].
- - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Submitted ePAS for testing installed dividers
- Installation of the LMS has been completed [6]
- Cable and divider installation [7]
- Install cable bundles on vertical chains
- Sort out dividers, set up jumpers (amplifier/by-pass) a]nd install them.
- Two optical patch panels for the trigger distribution installed (Armen and Mark) [8] [9]
- Ethernet switch installed [10]
- Connecting crates to the switch
- Preparing for testing installed dividers
- Detector installation page
- Other hardware projects
- --prototype of the ECAL veto counter
- --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster
- exhibit stand (modules, PMTs, etc.)
- Analysis/Simulation
- eta to ggpi0's update -- ig