Difference between revisions of "March 26, 2025 Calorimeter"
From GlueXWiki
(→Minutes) |
|||
Line 48: | Line 48: | ||
= Minutes = | = Minutes = | ||
− | ''Attendees: Simon, Igal, Varun, Harsimran, Mac, Zisis'' | + | ''Attendees: Simon, Igal, Varun, Harsimran, Mac, Malte, Mark, Zisis'' |
− | # Announcements: beam could start this weekend. | + | # Announcements: beam could start this weekend; May 11-13 collab meeting. |
# Past Meeting Minutes: no review | # Past Meeting Minutes: no review | ||
# Review Action Items: no review | # Review Action Items: no review | ||
− | # Detectors | + | # Detectors |
## FCAL/ECAL: | ## FCAL/ECAL: | ||
− | ## BCAL | + | ##* readiness is pretty good - last few channels being checked; translation table updated. ~2 bases/day need changing. Chaining bases and getting ready, cables to be fixed (LEMO) all fine. Issue FADCs (long known) - whole module has issue with DAC chip; replaced yesterday. Sth new: we are blowing individual ADC channels: 9 channels; cause is unknown. No available personnel from fast electronics group to fix these. Swapped channels and Justin adjusted ccdb for channel map. 2 ADC boards still available one with 5 and one with 8 channels free. Could it be soldering resistor or jumper? Visual inspection by Malte did not reveal anything obvious. Diagnostics need us to find a full spare to replace a malfunctioning one. Talking to Hall B to see if we can borrow boards. Running the LED chains to make sure everything looks good; hot checkout will be completed soon. |
− | # Calibration | + | ## BCAL: hot checkout all good. |
− | # Monitoring | + | # Calibration: no report. |
+ | # Monitoring: Varun and Harsimran will do Hydra with Tolga; LED monitoring. Upstream LED occupancy script issue not solved. Standard LED monitoring will work. | ||
# Reconstruction | # Reconstruction | ||
− | ## Covariance Matrix update - Varun [https://halldweb.jlab.org/wiki/images/9/92/CovariancematrixUpdate.pdf] | + | ## Covariance Matrix update - Varun [https://halldweb.jlab.org/wiki/images/9/92/CovariancematrixUpdate.pdf]. |
# Simulations | # Simulations | ||
# Any other business | # Any other business |
Revision as of 11:22, 26 March 2025
Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time
Contents
Connection instructions
References
- FCAL HDFCAL log book
- ECAL HDECAL log book
- BCAL HDBCAL log book
- CCAL HDCCAL log book
- Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
- Photon Reconstruction Task Force
- BCAL calibration links, 2020, PrimEx, SRC
- BCAL pi0 calibration
- FCAL calibration
Goals for Calorimetry Group
- Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
- Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
- Demonstrate agreement of photon resolution between data and simulation as a function of E, phi and theta to within 5%.
- Demonstrate agreement of photon reconstruction efficiency between data and simulation as a function of E, phi and theta to within 5%.
Action Items
- Short term CALWG Items
- Long term items
- Calorimeter work packages
- AI - BCAL Monitoring:
Tentative Agenda
- Announcements
- Past Meeting Minutes
- Review Action Items
- Detectors
- FCAL/ECAL
- BCAL
- Calibration
- Monitoring
- Reconstruction
- Covariance Matrix update - Varun [1]
- Simulations
- Any other business
Minutes
Attendees: Simon, Igal, Varun, Harsimran, Mac, Malte, Mark, Zisis
- Announcements: beam could start this weekend; May 11-13 collab meeting.
- Past Meeting Minutes: no review
- Review Action Items: no review
- Detectors
- FCAL/ECAL:
- readiness is pretty good - last few channels being checked; translation table updated. ~2 bases/day need changing. Chaining bases and getting ready, cables to be fixed (LEMO) all fine. Issue FADCs (long known) - whole module has issue with DAC chip; replaced yesterday. Sth new: we are blowing individual ADC channels: 9 channels; cause is unknown. No available personnel from fast electronics group to fix these. Swapped channels and Justin adjusted ccdb for channel map. 2 ADC boards still available one with 5 and one with 8 channels free. Could it be soldering resistor or jumper? Visual inspection by Malte did not reveal anything obvious. Diagnostics need us to find a full spare to replace a malfunctioning one. Talking to Hall B to see if we can borrow boards. Running the LED chains to make sure everything looks good; hot checkout will be completed soon.
- BCAL: hot checkout all good.
- FCAL/ECAL:
- Calibration: no report.
- Monitoring: Varun and Harsimran will do Hydra with Tolga; LED monitoring. Upstream LED occupancy script issue not solved. Standard LED monitoring will work.
- Reconstruction
- Covariance Matrix update - Varun [2].
- Simulations
- Any other business