Difference between revisions of "Calorimeter Review"
From GlueXWiki
(→Relevant Wiki Pages) |
(→Material Prepared for the Review) |
||
Line 7: | Line 7: | ||
== Material Prepared for the Review == | == Material Prepared for the Review == | ||
+ | |||
+ | * GlueX-doc-985 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=985 Physics and Calorimeter Performance Metrics] | ||
+ | * GlueX-doc-986 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=986 BCAL: Barrel Calorimeter]] | ||
+ | * GlueX-doc-987 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=987 SiPM for BCAL] | ||
+ | * GlueX-doc-988 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=988 FCAL: Forward Calorimeter] | ||
+ | * GlueX-doc-989 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=989 Calorimeter Simulations] | ||
== Relevant Wiki Pages == | == Relevant Wiki Pages == |
Revision as of 13:21, 13 May 2008
Contents
The Hall D Calorimeter Final Design and Safety Review
- Charge, Agenda, Reviewers,
- Review Documents
- P3e Schedule
- Previous Reviews
Material Prepared for the Review
- GlueX-doc-985 Physics and Calorimeter Performance Metrics
- GlueX-doc-986 BCAL: Barrel Calorimeter]
- GlueX-doc-987 SiPM for BCAL
- GlueX-doc-988 FCAL: Forward Calorimeter
- GlueX-doc-989 Calorimeter Simulations
Relevant Wiki Pages
- Description BCAL
- Description FCAL
- Description Electronics
- Description Calibration-Monitoring
- Safety/QA documentation ESH&Q
Dry Run Schedule for the Review
- First round of dry runs (week of 4th of February)
- Second round of dry runs (week of 11th of February) TENTATIVE
- Pre-brief Material. Due Feb 11 to reviewers.
- Calorimeter Document
- Drawings
- Other?
- Final talks to Elke: 17th of February.
- Review: Feb 19 and 20.
- issues that need special attention