Difference between revisions of "JEF meeting, May 24, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 27: Line 27:
 
* '''Other hardware projects'''
 
* '''Other hardware projects'''
 
** prototype of the ECAL veto counter (?)
 
** prototype of the ECAL veto counter (?)
 +
*** Impact of veto on eta channels from Feb'24 collaboration meeting: [[File:p9.pdf]]
 
*'''FCAL2 posters for open house'''
 
*'''FCAL2 posters for open house'''
 
** JEF/ECAL/FCAL poster  (Laveen + students + feedback from all of us)  
 
** JEF/ECAL/FCAL poster  (Laveen + students + feedback from all of us)  
 
** [https://halldweb.jlab.org/wiki/images/2/2c/1-OH24Poster-V-LAVEEN-revised.pdf  JEF physics poster] (Laveen)
 
** [https://halldweb.jlab.org/wiki/images/2/2c/1-OH24Poster-V-LAVEEN-revised.pdf  JEF physics poster] (Laveen)
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''

Revision as of 08:16, 24 May 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
    • - HV distribution boards: has not yet been designed, need 4 boards
    • - LV cables: missing about 20 cables, waiting for the last delivery batch.
    • - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers Media:lv_distribution.jpg
    • - LED: prototype board is ready, have to start testing
  • Ongoing projects - All
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - File:Regulators.xlsx Map of dividers with removed regulators
    • - Testing procedure [2]
    • - All dividers have been fabricated and tested by George [3]
      • Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
  • Summer students -- Sasha
    • - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
    • - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
    • prototype of the ECAL veto counter (?)
      • Impact of veto on eta channels from Feb'24 collaboration meeting: File:P9.pdf
  • FCAL2 posters for open house
    • JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us)
    • JEF physics poster (Laveen)
  • Analysis/Simulation