Difference between revisions of "December 18, 2024 Calorimeter"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 52: Line 52:
 
# Past Meeting Minutes: no review
 
# Past Meeting Minutes: no review
 
# Review Action Items
 
# Review Action Items
# Short: Zisis will coordinate with Tolga on hydra for the calorimeters in 2025
+
# Short: Zisis will coordinate with Tolga on Hydra for the calorimeters in 2025. Simon commented that we have generate fake histos to train Hydra on FCAL2.
 
# Detectors
 
# Detectors
 
## FCAL/ECAL:
 
## FCAL/ECAL:
 
#* Mark reported that there are channels in FCAL that are not functioning and these will be tackled in January. Voltage calibration with cosmics looks promising.
 
#* Mark reported that there are channels in FCAL that are not functioning and these will be tackled in January. Voltage calibration with cosmics looks promising.
 
#* Simon reported that the ECAL south scalers look good and that the permanent (new) HV boxes are in place.  The north still has the temp ones.
 
#* Simon reported that the ECAL south scalers look good and that the permanent (new) HV boxes are in place.  The north still has the temp ones.
## BCAL
+
## BCAL: no report
# Calibration
+
# Calibration: no report
# Monitoring
+
# Monitoring: see action item above
 
# Reconstruction
 
# Reconstruction
 
#* Mark, Zisis, Harsimran and Varun will meet tomorrow to plan the photon covariance matrix work for 2025.
 
#* Mark, Zisis, Harsimran and Varun will meet tomorrow to plan the photon covariance matrix work for 2025.
# Simulations
+
# Simulations: no report
 
# Any other business:
 
# Any other business:
 
#* Meetings left this year: LMD tomorrow morning (chaired by Simon), JEF on Friday (chaired by Sasha), Run Coordination on Friday (chaired by Alexandre).
 
#* Meetings left this year: LMD tomorrow morning (chaired by Simon), JEF on Friday (chaired by Sasha), Run Coordination on Friday (chaired by Alexandre).

Revision as of 11:12, 18 December 2024

Meeting Day/Time: every other WEDNESDAY at 11:00 a.m. JLab time

Connection instructions

Connect to ZoomGov Meetings

References

  1. FCAL HDFCAL log book
  2. ECAL HDECAL log book
  3. BCAL HDBCAL log book
  4. CCAL HDCCAL log book
  5. Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
  6. Photon Reconstruction Task Force
  7. BCAL calibration links, 2020, PrimEx, SRC
  8. BCAL pi0 calibration
  9. FCAL calibration

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
  3. Demonstrate agreement of photon resolution between data and simulation as a function of E, phi and theta to within 5%.
  4. Demonstrate agreement of photon reconstruction efficiency between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Short term CALWG Items
  2. Long term items
  3. Calorimeter work packages
  4. AI - BCAL Monitoring:
    1. Hydra Real-Time Dashboard
    2. Hydra 24-hr Monitoring Logs

Tentative Agenda

  1. Announcements
  2. Past Meeting Minutes
  3. Review Action Items
  4. Detectors
    1. FCAL/ECAL
    2. BCAL
  5. Calibration
  6. Monitoring
  7. Reconstruction
  8. Simulations
  9. Any other business

Minutes

Attendees: Mark, Simon, Zisis

  1. Announcements: none
  2. Past Meeting Minutes: no review
  3. Review Action Items
  4. Short: Zisis will coordinate with Tolga on Hydra for the calorimeters in 2025. Simon commented that we have generate fake histos to train Hydra on FCAL2.
  5. Detectors
    1. FCAL/ECAL:
    • Mark reported that there are channels in FCAL that are not functioning and these will be tackled in January. Voltage calibration with cosmics looks promising.
    • Simon reported that the ECAL south scalers look good and that the permanent (new) HV boxes are in place. The north still has the temp ones.
    1. BCAL: no report
  6. Calibration: no report
  7. Monitoring: see action item above
  8. Reconstruction
    • Mark, Zisis, Harsimran and Varun will meet tomorrow to plan the photon covariance matrix work for 2025.
  9. Simulations: no report
  10. Any other business:
    • Meetings left this year: LMD tomorrow morning (chaired by Simon), JEF on Friday (chaired by Sasha), Run Coordination on Friday (chaired by Alexandre).