Difference between revisions of "2012-10-31"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday October 31, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == ...") |
(→Reports from Technical Groups: tof) |
||
Line 53: | Line 53: | ||
** FDC | ** FDC | ||
* PID | * PID | ||
− | ** TOF [[GlueX TOF Meeting, | + | ** TOF [[GlueX TOF Meeting, October 25, 2012|October 25, 2012]] |
** Start Counter [[GlueX Start Counter Meeting, September 20, 2012#Minutes|September 20, 2012]] | ** Start Counter [[GlueX Start Counter Meeting, September 20, 2012#Minutes|September 20, 2012]] | ||
** PID Upgrades [[September 17, 2012 PID Upgrade|September 17, 2012]] | ** PID Upgrades [[September 17, 2012 PID Upgrade|September 17, 2012]] |
Revision as of 13:25, 30 October 2012
Contents
Meeting Time and Place
The meeting will be on Wednesday October 31, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
Announcements
Action Items
- TDR Editor
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
- UCONN
Technical Design Report
Reports from Technical Groups
- Calorimeters
- Beam Tests
- Calorimetry October 9, 2012
- BCAL Readout October 16, 2012
- Tracking September 12, 2012
- CDC
- FDC
- PID
- TOF October 25, 2012
- Start Counter September 20, 2012
- PID Upgrades September 17, 2012
- Engineering
- Magnet
- Target
- Engineering Activities
- Electronics
- Technical Design Report
- Trigger September 12, 2012
- DAQ/Monitoring/Controls September 12, 2012
- Offline
- Software Meeting September 19, 2012
- Data Challenge October 8, 2012
- Photon Beam and Tagger October 15, 2012
- Physics September 10, 2012