JEF meeting, May 10, 2024
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables and 2 patch panels [1] - done
- - HV short cables: done
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: not designed
- - LV cables: waiting for about 20 cables
- - LV distribution boards [2]. One board out of 4 is ready
- - LED: the prototype of the LED board has been received. Chris will populate it with components
- Ongoing projects
- - Update from Laveen
- - Testing, labeling and bundling LV cables
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation of the LMS has been completed [5]
- Installation and testing cables and dividers [6] [7]
- Detector installation page
- Preparation for beam tests with the PS
- measure shower beam profile
- shower reconstruction between PbWO4 and LG
- Other hardware projects
- --prototype of the ECAL veto counter
- --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster
- Analysis/Simulation