Difference between revisions of "2016-06-22"
From GlueXWiki
(→Data Acquisition and Electronics Systems) |
(→Detector Updates) |
||
Line 46: | Line 46: | ||
** Magnets | ** Magnets | ||
** Other Activities | ** Other Activities | ||
− | * Beamline Status [[BLTWG Meeting 06/ | + | * Beamline Status [[BLTWG Meeting 06/20/2016|June 20, 2016]] |
** Diamonds | ** Diamonds | ||
** Active Collimator | ** Active Collimator | ||
Line 54: | Line 54: | ||
** Polarimeter | ** Polarimeter | ||
* Start Counter [[GlueX Start Counter Meeting, March 24, 2016|March 24, 2016]] | * Start Counter [[GlueX Start Counter Meeting, March 24, 2016|March 24, 2016]] | ||
− | * Tracking [[minutes- | + | * Tracking [[minutes-6-16-2016|June 16, 2016]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
− | * Calorimeters: [[June | + | * Calorimeters: [[June 16, 2016 Calorimeter|June 16, 2016]] |
** BCAL | ** BCAL | ||
** FCAL | ** FCAL |
Revision as of 07:30, 19 June 2016
Contents
Meeting Time and Place
The meeting will be on Wednesday June 22, 2016 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
The Fall 2016 Run
Analysis Activities
- Offline Software (June 8, 2016 Meeting),
- Analysis Working Group June 14, 2016
- Calibration June 15, 2016
- Physics Working Group June 13, 2016
Data Acquisition and Electronics Systems
- Online Systems June 15, 2016
- DAQ
- Controls Status
- Monitoring
- Level-3 Trigger
- Electronics and Trigger
- Electronics Update
- FADC FPGA
- Level-1 Trigger
Detector Updates
- Engineering Activities
- Target
- Magnets
- Other Activities
- Beamline Status June 20, 2016
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter March 24, 2016
- Tracking June 16, 2016
- CDC
- FDC
- Calorimeters: June 16, 2016
- BCAL
- FCAL
- TOF March 8, 2016
- DIRC System June 3, 2016 PID Upgrade
Other Activities
- AOT