# Status of GlueX-II data production at NERSC and PSC (Dave)
 
# Status of GlueX-II data production at NERSC and PSC (Dave)
 
#* near term plan:  shift some processing back to JLab farm; investigate processing at IU; hope to complete spring data by the end of the year
 
#* near term plan:  shift some processing back to JLab farm; investigate processing at IU; hope to complete spring data by the end of the year
# PrimEx calibration status and next monitoring launch (Sasha)
+
# PrimEx calibration status (Sasha)
 +
#* reproduce PS skims and make first REST version
 
# SRC proposal
 
# SRC proposal
 
#* anticipate response from Curtis and George soon
 
#* anticipate response from Curtis and George soon
Line 41: Line 42:
 
* Software and Analysis
 
* Software and Analysis
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/September_23,_2020,_Analysis_Working_Group September 23, 2020] (Alex)
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/September_23,_2020,_Analysis_Working_Group September 23, 2020] (Alex)
 +
*** status of analysis launches
 
** Offline Meeting:  [[GlueX_Software_Meeting,_September_15,_2020| September 15, 2020]] (Mark)
 
** Offline Meeting:  [[GlueX_Software_Meeting,_September_15,_2020| September 15, 2020]] (Mark)
 
** Particle ID Working Group: [[GlueX_PID_Meeting,_August_25,_2020 | August 25, 2020]] (Simon)
 
** Particle ID Working Group: [[GlueX_PID_Meeting,_August_25,_2020 | August 25, 2020]] (Simon)
  
 
* Topical meetings
 
* Topical meetings
** Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/August_18,_2020,_Physics_Working_Group August 18, 2020] (Sean)
+
** Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/September_15,_2020,_Physics_Working_Group September 15, 2020] (Sean)
 
*** [https://halldweb.jlab.org/wiki-private/index.php/GlueX_DNP_2020 DNP abstracts]
 
*** [https://halldweb.jlab.org/wiki-private/index.php/GlueX_DNP_2020 DNP abstracts]
 
**** If you have submitted a DNP abstract, and are not regularly presenting at a topic WG meeting, it would be helpful to have a short (~5 min) status report within the next month at the appropriate meeting
 
**** If you have submitted a DNP abstract, and are not regularly presenting at a topic WG meeting, it would be helpful to have a short (~5 min) status report within the next month at the appropriate meeting
 
**** Reminder that all results shown in public should be presented to the Collaboration and approved prior to your practice talk
 
**** Reminder that all results shown in public should be presented to the Collaboration and approved prior to your practice talk
 
*** Status of [[Private:Papers_Under_Review | papers under review]]
 
*** Status of [[Private:Papers_Under_Review | papers under review]]
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_24,_2020 August 24, 2020] (Alex A.)
+
** Amplitude Analysis Working Group:  last meeting was[https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_24,_2020 August 24, 2020] (Alex A.)
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_24,_2020,_Cross_Section_Working_Group August 24, 2020] (Justin)
+
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/September_21,_2020,_Cross_Section_Working_Group September 21, 2020] (Justin)
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2020-08-31 August 31, 2020] (Zisis/Simon)
+
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2020-09-12 September 12, 2020] (Zisis)
** PrimEx Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Sep_4,_2020_PrimEx-Eta_Meeting September 4, 2020] (Sasha)
+
** PrimEx Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Sep_18,_2020_PrimEx-Eta_Meeting September 18, 2020] (Sasha)
** Di-lepton Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_August_27,_2020 August 27, 2020] (Sean)
+
** Di-lepton/Rare Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_September_10,_2020 September 10, 2020] (Sean)
** JEF:  [[JEF_meeting,_September_4,_2020 | September 4, 2020]] (Simon/Liping/Sasha)  
+
** JEF:  [[JEF_meeting,_September_18,_2020 | September 18, 2020]] (Simon/Liping/Sasha)  
  
 
* Hardware Working Groups:
 
* Hardware Working Groups:
 
** Engineering Activities:  FCAL-II, CPP, other (Tim)  
 
** Engineering Activities:  FCAL-II, CPP, other (Tim)  
*** last meeting:  [https://halldweb.jlab.org/wiki/index.php/August_04,_2020_CPP_Design_Meeting CPP August 4, 2020]
+
*** last meeting:  [https://halldweb.jlab.org/wiki/index.php/September_17,_2020_CPP_Design_Meeting CPP September 17, 2020]
 
** Electronics and Firmware (Fernando)
 
** Electronics and Firmware (Fernando)
** Beamline Status:  [[BLTWG_Meeting_09/01/2020 | September 1, 2020]] (Richard)
+
** Beamline Status:  [[BLTWG_Meeting_09/15/2020 | September 15, 2020]] (Richard)
** Tracking: [[Meetings-9-3-2020 | September 3, 2020]] (Naomi/Lubomir)
+
** Tracking: [[Meetings-9-20-2020 | September 20, 2020]] (Naomi/Lubomir)
** DIRC: [[August_31,_2020_DIRC | August 31, 2020]] (Justin)
+
** DIRC: [[September_21,_2020_DIRC | September 21, 2020]] (Justin)
 
** Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
 
** Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
 
** Trigger (Sasha)
 
** Trigger (Sasha)
** Calorimetry [[Sep_03,_2020_Calorimeter | September 3, 2020]] (Zisis/Mark)
+
** Calorimetry [[Sep_17,_2020_Calorimeter | September 17, 2020]] (Zisis/Mark)
** Start Counter: [[GlueX_Start_Counter_Meeting,_August_20,_2020 | August 20, 2020]] (Mark I.)
+
** Start Counter: last meeting was [[GlueX_Start_Counter_Meeting,_August_20,_2020 | August 20, 2020]] (Mark I.)
** TOF:  [[GlueX TOF Meeting, September 9, 2020 | September 9, 2020]] (Mark I.)
+
** TOF:  [[GlueX TOF Meeting, September 23, 2020 | September 23, 2020]] (Mark I.)

Revision as of 16:19, 23 September 2020

Meeting Coordinates

The meeting will be on Thursday September 24, 2020 at 11:00 AM EDT.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Spring run is complete -- special thanks to local GlueX team!
      • Data size for 2020: about 115% of all GlueX phase 1
    • Virtual October Collaboration Meeting: Thursday 10/22 to Saturday 10/24
      • register here
      • emphasis on analysis and task-force reports: anticipate draft agenda soon
  2. Status of GlueX-II data production at NERSC and PSC (Dave)
    • near term plan: shift some processing back to JLab farm; investigate processing at IU; hope to complete spring data by the end of the year
  3. PrimEx calibration status (Sasha)
    • reproduce PS skims and make first REST version
  4. SRC proposal
    • anticipate response from Curtis and George soon
  5. Enhancing collaboration
    • GlueX photobook, login to portal and click "people" -- please add photos! (Naomi)
  6. PAC: jeopardy session is tomorrow
  7. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
    • Simulation needs: care and maintenance of OSG interface, updating smearing
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)