Difference between revisions of "2020-10-08"
From GlueXWiki
(Created page with "== Meeting Coordinates == The meeting will be on Thursday October 8, 2020 at 11:00 AM EDT. ==== Connecting ==== # To join via a Web Browser, go to the page [https://bluejean...") |
(→Agenda) |
||
Line 21: | Line 21: | ||
# Report from Snowmass discussions (Justin/Sean) | # Report from Snowmass discussions (Justin/Sean) | ||
# Preparations for DNP (Sean) | # Preparations for DNP (Sean) | ||
− | * [https://halldweb.jlab.org/wiki-private/index.php/GlueX_DNP_2020 DNP abstracts] | + | #* [https://halldweb.jlab.org/wiki-private/index.php/GlueX_DNP_2020 DNP abstracts] |
− | * If you have submitted a DNP abstract, and are not regularly presenting at a topic WG meeting, it would be helpful to have a short (~5 min) status report within the next month at the appropriate meeting | + | #* If you have submitted a DNP abstract, and are not regularly presenting at a topic WG meeting, it would be helpful to have a short (~5 min) status report within the next month at the appropriate meeting |
− | * Reminder that all results shown in public should be presented to the Collaboration and approved prior to your practice talk | + | #* Reminder that all results shown in public should be presented to the Collaboration and approved prior to your practice talk |
# Status of GlueX-II data production at NERSC and PSC (Dave) | # Status of GlueX-II data production at NERSC and PSC (Dave) | ||
# PrimEx calibration status (Sasha) | # PrimEx calibration status (Sasha) |
Revision as of 15:16, 7 October 2020
Contents
Meeting Coordinates
The meeting will be on Thursday October 8, 2020 at 11:00 AM EDT.
Connecting
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration Meeting
- SAD work activities and planning (Tim and/or Fernando)
- Report from Snowmass discussions (Justin/Sean)
- Preparations for DNP (Sean)
- DNP abstracts
- If you have submitted a DNP abstract, and are not regularly presenting at a topic WG meeting, it would be helpful to have a short (~5 min) status report within the next month at the appropriate meeting
- Reminder that all results shown in public should be presented to the Collaboration and approved prior to your practice talk
- Status of GlueX-II data production at NERSC and PSC (Dave)
- PrimEx calibration status (Sasha)
- SRC proposal
- response communicated to proponents by Curtis
- PAC
- Jeopardy outcome: maintain all experiments (GlueX/JEF/CPP) as scheduled
- Enhancing collaboration
- GlueX photobook, login to portal and click "people" -- please add photos! Over two-thirds of the collaboration is still missing.
- Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
- TAGH calibration, hardware maintenance, etc.
- Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
- maintenance of kinematic fitting framework
- Development of offsite data processing systems
- Maintenance of online monitoring tools (rootspy or full transition to hydra)
Additional brief reports from working groups as needed
- Software and Analysis
- Production and Analysis Working Group: September 23, 2020 (Alex)
- status of analysis launches
- Offline Meeting: September 15, 2020 (Mark)
- Particle ID Working Group: August 25, 2020 (Simon)
- Production and Analysis Working Group: September 23, 2020 (Alex)
- Topical meetings
- Physics Working Group September 15, 2020 (Sean)
- Status of papers under review
- Amplitude Analysis Working Group: last meeting wasAugust 24, 2020 (Alex A.)
- Cross-section Working Group: September 21, 2020 (Justin)
- Beam Asymmetry Working Group: September 12, 2020 (Zisis)
- PrimEx Working Group: September 18, 2020 (Sasha)
- Di-lepton/Rare Working Group: September 10, 2020 (Sean)
- JEF: September 18, 2020 (Simon/Liping/Sasha)
- Physics Working Group September 15, 2020 (Sean)
- Hardware Working Groups:
- Engineering Activities: FCAL-II, CPP, other (Tim)
- last meeting: CPP September 17, 2020
- Electronics and Firmware (Fernando)
- Beamline Status: September 15, 2020 (Richard)
- Tracking: September 17, 2020 (Naomi/Lubomir)
- DIRC: September 14, 2020 (Justin)
- Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
- Trigger (Sasha)
- Calorimetry September 17, 2020 (Zisis/Mark)
- Start Counter: last meeting was August 20, 2020 (Mark I.)
- TOF: September 23, 2020 (Mark I.)
- Engineering Activities: FCAL-II, CPP, other (Tim)