Difference between revisions of "Calorimeter Review"

From GlueXWiki
Jump to: navigation, search
(Relevant Wiki Pages)
(Material Prepared for the Review)
Line 7: Line 7:
  
 
==  Material Prepared for the Review ==
 
==  Material Prepared for the Review ==
 +
 +
* GlueX-doc-985 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=985 Physics and Calorimeter Performance Metrics]
 +
* GlueX-doc-986 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=986 BCAL: Barrel Calorimeter]]
 +
* GlueX-doc-987 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=987 SiPM for BCAL]
 +
* GlueX-doc-988 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=988 FCAL: Forward Calorimeter]
 +
* GlueX-doc-989 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=989 Calorimeter Simulations]
  
 
==  Relevant Wiki Pages ==
 
==  Relevant Wiki Pages ==

Revision as of 13:21, 13 May 2008

The Hall D Calorimeter Final Design and Safety Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

  1. First round of dry runs (week of 4th of February)
    1. Monday L207 Feb 4
    2. Wednesday F326/327 Feb 6
    3. Thursday F326/327 Feb 7
    4. Friday F326/327 Feb 8
  2. Second round of dry runs (week of 11th of February) TENTATIVE
    1. Monday F326/327 Feb 11
    2. Tuesday F326/327 Feb 12
    3. Wednesday F326/327 Feb 13
    4. Thursday F326/327 Feb 14
    5. Friday L207 Feb 15
  3. Pre-brief Material. Due Feb 11 to reviewers.
  4. Final talks to Elke: 17th of February.
  5. Review: Feb 19 and 20.
  6. issues that need special attention