Difference between revisions of "Calorimeter Review"

From GlueXWiki
Jump to: navigation, search
(The Hall D Calorimeter Final Design and Safety Review)
(The Hall D Calorimeter Final Design and Safety Review)
Line 1: Line 1:
 
== The Hall D Calorimeter Final Design and Safety Review ==
 
== The Hall D Calorimeter Final Design and Safety Review ==
  
* [http://www.jlab.org/Hall-D/reviews/Calo_Review_Feb08/] Charge, Agenda, Reviewers]  
+
* [http://www.jlab.org/Hall-D/reviews/Calo_Review_Feb08/Agenda.doc Agenda]
 +
* [http://www.jlab.org/Hall-D/reviews/Calo_Review_Feb08/ Website]
 
* [http://www.jlab.org/Hall-D/guest_secure/Calo_Review_Feb08/ Review Documents]
 
* [http://www.jlab.org/Hall-D/guest_secure/Calo_Review_Feb08/ Review Documents]
 
* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule]
 
* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule]

Revision as of 09:59, 14 May 2008

The Hall D Calorimeter Final Design and Safety Review

Material Prepared for the Review

  • Final versions of talks.

Relevant Wiki Pages

Dry Run Schedule for the Review

  1. First round of dry runs (week of 4th of February)
    1. Monday L207 Feb 4
    2. Wednesday F326/327 Feb 6
    3. Thursday F326/327 Feb 7
    4. Friday F326/327 Feb 8
  2. Second round of dry runs (week of 11th of February) TENTATIVE
    1. Monday F326/327 Feb 11
    2. Tuesday F326/327 Feb 12
    3. Wednesday F326/327 Feb 13
    4. Thursday F326/327 Feb 14
    5. Friday L207 Feb 15
  3. Pre-brief Material. Due Feb 11 to reviewers.
  4. Final talks to Elke: 17th of February.
  5. Review: Feb 19 and 20.
  6. issues that need special attention