December 14, 2016 Calibration

From GlueXWiki
Revision as of 13:22, 14 December 2016 by Sdobbs (Talk | contribs) (Agenda)

Jump to: navigation, search

GlueX Calibration Meeting
Wednesday, December 14, 2016
11:00 am, EST
JLab: CEBAF Center, F326

Communication Information

Remote Connection

You can connect using BlueJeans using the meeting number 630 804 895 .       (Click "Expand" to the right for more details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 630804895
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above
    • Use *4 to unmute

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2016 on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2016/ .

Calibration Tasks

  1. Spring 2016 Recon Checklist
  2. Mcsmear updates
  3. Data Validation
  4. GlueX Detector Performance Document

Upcoming Calibrations

  • Add timing information to FCAL clustering/inner ring calibrations? (Adesh/Matt S.)
  • BCAL TDC calibrations (Andrei)
  • TAGH alignment (Nathan)
  • Tagger energy map (Richard J.?)
  • TOF alignment (Beni/Simon)

Agenda

  1. Announcements
  2. Run Planning
  3. Calibration Updates
  4. Alignment
  5. Simulations
  6. AOB

Minutes

Attending: Sean (NU); Simon, Lubomir, Mike S., Alex A., Mark D., Thomas, Mark I. (JLab);

  1. Announcements
    • Short meeting, beam being tuned to the tagger hall.
  2. Run Planning
    • Firmware Updates
      • Sean reported that using the cosmic data over the weekend, the f250 firmware looks well understood and tests with beam data are next.
      • Naomi reported that Cody updated the the CDC & FDC crates with a minor bug fix
    • Calibrations to run
      • Sean reported that the offline jobs are ready, automated calibrations won't be tested during the run, since we'll only have just enough time to recalibrate the detector.
    • HV scans are planned for the CDC, TOF, and TAGH. Personnel are ready to analyze this data.
  3. Calibration Updates
    • BCAL - Sean will provide an updated SQLite CCDB file to Regina to help with development of timing corrections in sim-recon.
    • SC - Mahmoud compared some simulations
  4. Alignment
    • Mike has been working on the cathode alignment and has finally found one of the bugs in sim-recon with how the alignment parameters are applied, and now gets consistent residuals with Lubomir's standalone code.
    • After this, all other alignment needs to be revisited, should have a big impact in the next reconstruction launch.
    • Lubomir has some code that compares his reconstruction with sim-recon on an event-by-event and hit-by-hit level basis, which was very helpful in solving these problems. He is currently working on fixing some finer problems, such as the location dependence of reconstructed hits.
  5. Simulations
  6. AOB