Difference between revisions of "JEF meeting, April 19, 2024"

From GlueXWiki
Jump to: navigation, search
 
(5 intermediate revisions by 2 users not shown)
Line 23: Line 23:
 
** - Adding ECAL (and updating FCAL) translation table in the TT.DB  (needed for EPICS scalers)  
 
** - Adding ECAL (and updating FCAL) translation table in the TT.DB  (needed for EPICS scalers)  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
** All ePASes are ready for the installation -- Sasha and Vlad
+
** Submitted ePAS for testing installed dividers
*** - need to prepare one for testing dividers and maintenance (done)
+
 
** <span style="color: red"> Installation of the LMS has been completed </span>  [https://logbooks.jlab.org/entry/4282307]
 
** <span style="color: red"> Installation of the LMS has been completed </span>  [https://logbooks.jlab.org/entry/4282307]
 
** Cable and divider installation [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable3.jpg] [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable2.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable1.jpg]
 
** Cable and divider installation [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable3.jpg] [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable2.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable1.jpg]
 +
*** Install cable bundles on vertical chains
 +
*** Sort out dividers, set up jumpers (amplifier/by-pass) and install them.
 
** Bundles with optical fibers for the trigger have been installed (Chris, Armen, Mark). Need to install 2 patch panels [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/optical_trigger.jpg]
 
** Bundles with optical fibers for the trigger have been installed (Chris, Armen, Mark). Need to install 2 patch panels [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/optical_trigger.jpg]
 
** Receive optical network fibers. Will install them as well as the network switch during next week [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/network_bundle.jpg]
 
** Receive optical network fibers. Will install them as well as the network switch during next week [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/network_bundle.jpg]
** 7 VXS controllers can be booted now [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/daq.jpg]
+
** <s> 7 VXS controllers can be booted now [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/daq.jpg] </s>
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg])
 
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg])
Line 36: Line 37:
 
*** --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
 
*** --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''
 +
** [https://halldweb.jlab.org/wiki/images/7/7c/Glue-jefxd-igal-jaegle-19042024.pdf Updates] --ig
 
*'''FCAL2 poster for open house?'''
 
*'''FCAL2 poster for open house?'''
 
** JEF/ECAL/FCAL poster   
 
** JEF/ECAL/FCAL poster   
 
** exhibit stand (modules, PMTs, etc.)
 
** exhibit stand (modules, PMTs, etc.)
 +
 +
=Minutes=
 +
Attendees: Sasha, Bill, Laveen, Zisis, Igal, Liping, Malte, Stjepan, Vlad, Jane, Hakob, S.T.
 +
* Received 3 boxes of LV cables -- still need 290 cables
 +
* LMS installation
 +
** All fibers connected to ECAL modules
 +
** Light injection to integrating sphere using LEDs
 +
*** PCB housing LEDs to be glued to flange
 +
*** Currently 5 blue LEDs, thinking about other colors (red?)
 +
*** CAEN 1495 to be used to drive electronics, need to check pulse heights
 +
** Two reference PMTs
 +
* PMT dividers
 +
** ePAS in place for installation
 +
** 180 regulators removed, need to be retested
 +
** Plan to make light tight and test using oscilloscope after each 1-2 rows installed
 +
* Work continues connecting optical fibers for readout/trigger electronics
 +
* Low level software development continues (TTAB, geometry,...)
 +
* Igal gave update on &eta;&rarr;&pi;0&gamma;&gamma; studies using spring 2017 data set
 +
** 4 photons in FCAL, with and without recoil proton
 +
** Choose combination with best &chi;^2
 +
** Sees evidence for &eta;'&rarr;&omega;&gamma; -- can use as reference channel
 +
** No evidence for signal channel
 +
** Huge 2&pi;0 + significant 2&gamma; backgrounds

Latest revision as of 10:02, 22 April 2024

Meeting time and location:

  • Preparation of parts for ECAL -- Sasha
    • - signal cables - done
    • - signal patch panel [1] - done
    • - HV short cables: received, checked, labeled (last week)
    • - HV long cable, 18 ready (out of 36)
    • - HV distribution boards: in preparation
    • - LV cables: waiting for about 440 - 150 = 290 cables (will need to test, label, and bundle)
    • - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
    • - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well
  • Ongoing projects
    • - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (29 layers done, waiting for cables)
    • - Testing, labeling, and bundling LV cables [3] [4] [5]
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - Testing procedure [6]
    • - Mindy has finished with preparing all sockets (~1650) !
    • - All dividers have been fabricated
    • - Need to remove power regulators on about 200 dividers
    • - George has tested about 1400 dividers [7].
    • - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Submitted ePAS for testing installed dividers
    • Installation of the LMS has been completed [8]
    • Cable and divider installation [9] [10][11]
      • Install cable bundles on vertical chains
      • Sort out dividers, set up jumpers (amplifier/by-pass) and install them.
    • Bundles with optical fibers for the trigger have been installed (Chris, Armen, Mark). Need to install 2 patch panels [12]
    • Receive optical network fibers. Will install them as well as the network switch during next week [13]
    • 7 VXS controllers can be booted now [14]
    • Detector installation page
    • Other hardware projects
      • --prototype of the ECAL veto counter
      • --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
  • Analysis/Simulation
  • FCAL2 poster for open house?
    • JEF/ECAL/FCAL poster
    • exhibit stand (modules, PMTs, etc.)

Minutes

Attendees: Sasha, Bill, Laveen, Zisis, Igal, Liping, Malte, Stjepan, Vlad, Jane, Hakob, S.T.

  • Received 3 boxes of LV cables -- still need 290 cables
  • LMS installation
    • All fibers connected to ECAL modules
    • Light injection to integrating sphere using LEDs
      • PCB housing LEDs to be glued to flange
      • Currently 5 blue LEDs, thinking about other colors (red?)
      • CAEN 1495 to be used to drive electronics, need to check pulse heights
    • Two reference PMTs
  • PMT dividers
    • ePAS in place for installation
    • 180 regulators removed, need to be retested
    • Plan to make light tight and test using oscilloscope after each 1-2 rows installed
  • Work continues connecting optical fibers for readout/trigger electronics
  • Low level software development continues (TTAB, geometry,...)
  • Igal gave update on η→π0γγ studies using spring 2017 data set
    • 4 photons in FCAL, with and without recoil proton
    • Choose combination with best χ^2
    • Sees evidence for η'→ωγ -- can use as reference channel
    • No evidence for signal channel
    • Huge 2π0 + significant 2γ backgrounds