Line 27: Line 27:
 
** Cable and divider installation [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable3.jpg] [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable2.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable1.jpg]
 
** Cable and divider installation [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable3.jpg] [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable2.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_19_2024/cable1.jpg]
 
*** Install cable bundles on vertical chains  
 
*** Install cable bundles on vertical chains  
*** Sort out dividers and set up jumpers (amplifier/by-pass).
+
*** Sort out dividers, set up jumpers (amplifier/by-pass) and install them.
 
** Bundles with optical fibers for the trigger have been installed (Chris, Armen, Mark). Need to install 2 patch panels [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/optical_trigger.jpg]
 
** Bundles with optical fibers for the trigger have been installed (Chris, Armen, Mark). Need to install 2 patch panels [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/optical_trigger.jpg]
 
** Receive optical network fibers. Will install them as well as the network switch during next week [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/network_bundle.jpg]
 
** Receive optical network fibers. Will install them as well as the network switch during next week [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/network_bundle.jpg]

Revision as of 09:16, 19 April 2024

Meeting time and location:

  • Preparation of parts for ECAL -- Sasha
    • - signal cables - done
    • - signal patch panel [1] - done
    • - HV short cables: received, checked, labeled (last week)
    • - HV long cable, 18 ready (out of 36)
    • - HV distribution boards: in preparation
    • - LV cables: waiting for about 440 - 150 = 290 cables (will need to test, label, and bundle)
    • - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
    • - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well
  • Ongoing projects
    • - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (29 layers done, waiting for cables)
    • - Testing, labeling, and bundling LV cables [3] [4] [5]
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - Testing procedure [6]
    • - Mindy has finished with preparing all sockets (~1650) !
    • - All dividers have been fabricated
    • - Need to remove power regulators on about 200 dividers
    • - George has tested about 1400 dividers [7].
    • - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Submitted ePAS for testing installed dividers
    • Installation of the LMS has been completed [8]
    • Cable and divider installation [9] [10][11]
      • Install cable bundles on vertical chains
      • Sort out dividers, set up jumpers (amplifier/by-pass) and install them.
    • Bundles with optical fibers for the trigger have been installed (Chris, Armen, Mark). Need to install 2 patch panels [12]
    • Receive optical network fibers. Will install them as well as the network switch during next week [13]
    • 7 VXS controllers can be booted now [14]
    • Detector installation page
    • Other hardware projects
      • --prototype of the ECAL veto counter
      • --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
  • Analysis/Simulation
  • FCAL2 poster for open house?
    • JEF/ECAL/FCAL poster
    • exhibit stand (modules, PMTs, etc.)