Difference between revisions of "JEF meeting, December 16, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 3: Line 3:
 
*Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142] Passcode: 004965
 
*Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142] Passcode: 004965
  
=Agenda=
 
 
=Agenda=
 
=Agenda=
  
Line 28: Line 27:
 
* '''Light Monitoring System''' -- Arshak
 
* '''Light Monitoring System''' -- Arshak
 
* '''Simulations/Analysis'''
 
* '''Simulations/Analysis'''
 +
 +
=Minutes=
 +
Attendees: Sasha, Igal, Joerg, Malte, Phil, Zisis, Igor, Jane, Olga, Susan, Eugene, Bill, S.T.
 +
* Waiting for last 10 Crytur crystals from physics divison
 +
* Expect final batch of 75 Crytur crystals in May
 +
* Crystal wrapping andwire soldering by Mindy of detector support group continues
 +
* Grand total of fabricated modules = 1378
 +
** Starting to move crystals to new area in EEL building
 +
* Sasha met with Fernando regarding PMT divider order and other divider details
 +
** 1 PMT/divider for bench tests with/without amplifier:  noise test in FCAL dark room, no big issues found
 +
** NPS added RF filter to their divider design due to high noise levels -- not needed for our lower-gain design
 +
** Will order high lead-time divider components in anticipation of full order early next year
 +
** Chris S. to make PCB prototype
 +
** Discussed possibility of replacing unshielded ribbon cables with shielded ones
 +
** Make 5x5 prototype to test in hall during GlueX run in January/Februrary?
 +
** Sasha to work on GW contract, send dividers in February
 +
*Student lodging for summer
 +
** Arranging housing through Hall D administrative support
 +
** Need to be aware that ResFac will be booked for Hugs for a couple of weeks (early June?)

Revision as of 14:43, 16 December 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Sasha, Igal, Joerg, Malte, Phil, Zisis, Igor, Jane, Olga, Susan, Eugene, Bill, S.T.

  • Waiting for last 10 Crytur crystals from physics divison
  • Expect final batch of 75 Crytur crystals in May
  • Crystal wrapping andwire soldering by Mindy of detector support group continues
  • Grand total of fabricated modules = 1378
    • Starting to move crystals to new area in EEL building
  • Sasha met with Fernando regarding PMT divider order and other divider details
    • 1 PMT/divider for bench tests with/without amplifier: noise test in FCAL dark room, no big issues found
    • NPS added RF filter to their divider design due to high noise levels -- not needed for our lower-gain design
    • Will order high lead-time divider components in anticipation of full order early next year
    • Chris S. to make PCB prototype
    • Discussed possibility of replacing unshielded ribbon cables with shielded ones
    • Make 5x5 prototype to test in hall during GlueX run in January/Februrary?
    • Sasha to work on GW contract, send dividers in February
  • Student lodging for summer
    • Arranging housing through Hall D administrative support
    • Need to be aware that ResFac will be booked for Hugs for a couple of weeks (early June?)