Difference between revisions of "JEF meeting, December 2, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 6: Line 6:
  
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
** Received 25 CRYTUR crystals during this week [https://halldweb.jlab.org/wiki/index.php/CRYTUR]
+
** Received 20 + 8  CRYTUR crystals during this week [https://halldweb.jlab.org/wiki/index.php/CRYTUR]
 +
*** Expect to receive 25 more CRYTUR crystals from physics division by the end of this year
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 772 ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 772 ]  
 
*** Available for wrapping: 10 crystals were wrapped during last week
 
*** Available for wrapping: 10 crystals were wrapped during last week

Revision as of 09:55, 2 December 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Installation of the FCAL2 detector -- Sasha / Arshak
  • Light Monitoring System -- Arshak
  • Simulations/Analysis