*'''Preparation of parts for ECAL''' -- Sasha | *'''Preparation of parts for ECAL''' -- Sasha | ||
− | ** - signal cables: all cables are ready. | + | ** - signal cables: all cables are ready. Received 75 long cables. They have been tested and labeled (will be used to replace FCAL cables removed from the FCAL) |
** - signal patch panels are ready [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ] | ** - signal patch panels are ready [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ] | ||
** - HV cables: 140 short cables (expect to receive most of them in 1-2 weeks), 36 long cables are in production | ** - HV cables: 140 short cables (expect to receive most of them in 1-2 weeks), 36 long cables are in production |
Revision as of 09:04, 3 November 2023
Meeting time and location:
- 10:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables: all cables are ready. Received 75 long cables. They have been tested and labeled (will be used to replace FCAL cables removed from the FCAL)
- - signal patch panels are ready [1]
- - HV cables: 140 short cables (expect to receive most of them in 1-2 weeks), 36 long cables are in production
- - HV distribution boards: check HV distribution boards during this week. Chris is finalizing design of the distribution board, should order 4 boards soon.
- - LV cables: ordered, lead time unclear
- - LV distribution boards: met with Chris and Stephanie on Monday last week. The design of the LV distribution board has been fixed.
- - Optical fibers: received all
- Ongoing projects -- Sasha, all
- - Tested and labeled 240 short signal cables (Recently labeled cables in boxes)
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections) [2]
- - Polished about 80 fiber plastic caps
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Light monitoring system
- Plastic caps have been glued to all fibers
- Returning low-quality crystals to SICCAS -- Sasha
- 11 crystals were wrapped and placed into the box; they are ready for shipment to SICCAS [13]
- Analysis/Simulation