=Minutes=
 +
Attendees: Arshak, Bill, Vlad B., Igal, Sasha, Zisis, Jon, Axel, Olga, Jane, S.T.
 +
* All short signal cables have arrived and have been checked
 +
* All long signal cables arrived
 +
* Signal patch panels arrived
 +
* Some HV cables have been delayed, others in production
 +
* Issue with interlock for CAEN multi-pin connectors
 +
* Design for LV distribution board finalized
 +
* Polishing fiber plastic caps for LMS system
 +
* Have inventory of ~80 lead tungstate modules with imperfections (chips, ...)
 +
** Plan to make 5x5 array to replace TAC (use G10 housing because no magnetic field in TAC position + no light guides)
 +
** Plan to make another 5x5 array to measure shower profile, use for various tests in PS setup in Hall
 +
* PMT dividers under production
 +
* All PMT dividers to be tested in dark box using LED
 +
* 4 racks in installed in Hall, being populated with electronics, power installation in ~2 weeks
 +
* Cooling blocks for FCAL to be hooked up by Tim's group
 +
* Next cables and LMS need to be installed (December?)
 +
* Waiting for results from survey+alignment crew

Latest revision as of 09:50, 23 October 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables: all cables are ready. 240 have been labeled during this week.
    • - signal patch panels are ready [1]
    • - HV cables: 140 short cables (expect to receive most of them in 1-2 weeks), 36 long cables are in production
    • - HV distribution boards: check HV distribution boards during this week. Chris is finalizing design of the distribution board, should order 4 boards soon.
    • - LV cables: ordered, lead time unclear
    • - LV distribution boards: met with Chris and Stephanie on Monday last week. The design of the LV distribution board has been fixed.
    • - Optical fibers: received all
  • Ongoing projects -- Sasha, all
Wrapped crystals
Parts for TAC[3]
Modules for prototype (17 ready)
  • Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
    • - Testing procedure [4]
    • - Tested the first batch of dividers [5]
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
  • Light monitoring system
    • Plastic caps have been glued to all fibers
  • Returning low-quality crystals to SICCAS -- Sasha
    • 11 crystals were wrapped and placed into the box; they are ready for shipment to SICCAS [13]
  • Analysis/Simulation

Minutes

Attendees: Arshak, Bill, Vlad B., Igal, Sasha, Zisis, Jon, Axel, Olga, Jane, S.T.

  • All short signal cables have arrived and have been checked
  • All long signal cables arrived
  • Signal patch panels arrived
  • Some HV cables have been delayed, others in production
  • Issue with interlock for CAEN multi-pin connectors
  • Design for LV distribution board finalized
  • Polishing fiber plastic caps for LMS system
  • Have inventory of ~80 lead tungstate modules with imperfections (chips, ...)
    • Plan to make 5x5 array to replace TAC (use G10 housing because no magnetic field in TAC position + no light guides)
    • Plan to make another 5x5 array to measure shower profile, use for various tests in PS setup in Hall
  • PMT dividers under production
  • All PMT dividers to be tested in dark box using LED
  • 4 racks in installed in Hall, being populated with electronics, power installation in ~2 weeks
  • Cooling blocks for FCAL to be hooked up by Tim's group
  • Next cables and LMS need to be installed (December?)
  • Waiting for results from survey+alignment crew