Difference between revisions of "May 5, 2008 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Agenda) |
||
Line 22: | Line 22: | ||
# FCAL Update | # FCAL Update | ||
# Calibration system update (Christina) | # Calibration system update (Christina) | ||
+ | #* [[Calibration-Monitoring]] | ||
# [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?) | # [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?) | ||
#* FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC | #* FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC |
Revision as of 10:28, 5 May 2008
Connection
- The meeting will be held at 10:30 am ET
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: April 21, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
- Schedule
Agenda
- BCAL Update
- Report on the visit to Alberta (George/Zisis)
- Fiber Specifications (Elton)
- Fiber Testing (evaluation, production)
- FCAL Update
- Calibration system update (Christina)
- Collaboration meeting On the schedule we have 1:15 min (what do we want to report? who?)
- FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
- BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
- Calibration:
- Monte Carlo:
- Any other business
Minutes
Online: