Line 20: |
Line 20: |
| | | |
| == Minutes == | | == Minutes == |
− | * Reviewed minutes from last meeting
| |
− | * Looked at Sasha's installation wiki page
| |
− | ** Showed different possible damage to wrapping of existing lead glass modules
| |
− | ** Is aluminum being stuck to module surface a performance issue (light yield)?
| |
− | *** Really no way to test now
| |
− | *** Need to decide threshold for re-wrapping
| |
− | ** Some inspection/labelling needed prior to unstacking of blocks
| |
− | ** Sasha proposed that him and Arshak inspect each module after removal to decide on action to be taken -
| |
− | ** Mark and Malte need to be in loop for base and pmt changes
| |
− | *** Possibly test light yield on first 100
| |
− | ** Malte asked who unstacked the original modules from BNL and what were the issues
| |
− | ** Looks like we will have about 500 good PMT spares
| |
− | ** Sasha presented manpower requirements
| |
− | *** would need 2 students for 30 weeks to re-wrap all old modules
| |
− | *** Total 11 students for 3 months will be needed for project (Eugene to check budgets)
| |
− | *** JLAB folks responsible for unstacking modules - Hall D Techs/DSG?
| |
− | *** Sasha/Arshak would train students to do module refurb
| |
− | *** Students would label and bundle cables
| |
− | *** JLAB tech staff handle structure, darkroom, cable trays, racks
| |
− | *** JLAB electronics group handle crate installation and cabling possibly with help from DSG
| |
− | *** Students would handle moving existing cables to adjacent crates on north and south racks
| |
− | *** Need to get a final list of universities supplying students
| |
− | *** Maybe best to downgrade the hall from RAD worker 1 to Gert only
| |
− | ** Sasha mentioned the need to re-strap some existing 25 micron brass strap crystal modules
| |
− | ** Need to start developing procedures for all aspects of the project
| |
− | ** Need to define workstations needed - add to Sasha's table and develop a layout
| |
− | * Need to have electric power added to south side of FCAL platform
| |
− | * Need to update strawman schedule with more detail including resources
| |
− | * Lead glass acrylic sheet same design as original - need to remake panes for new geometry
| |
| | | |
| == Action Items == | | == Action Items == |
− | * Develop required work stations needed and add to table - Sasha
| |
− | * Develop hall layout based on work stations - Tim/Stephanie
| |
− | * Update Gant chart with more detail and resources - Scot/Tim
| |
− | * Check to see if hall can be downgraded to a Radiologically Controlled area - Tim
| |
− | * Start developing procedures - Sasha - Tim
| |
− | * Determine what universities/students will be available - Sasha
| |
− | * Have electricians look at bringing power to new racks on south side - Tim
| |
− | * Determine if we have budget for students - Eugene
| |
− | * Design patch panels - Chris S./Stephanie
| |
Wednesday November 16, 2022 10am