Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

  • Wednesday, June 1, 2011<br> 1:30 pm EDT<br>
    6 KB (1,003 words) - 17:23, 31 March 2015
  • Thursday, September 1, 2011<br>
    2 KB (260 words) - 17:02, 24 February 2017
  • ** +1-866-740-1260 : US and Canada ** +1-303-248-0285 : International
    5 KB (754 words) - 17:12, 24 February 2017
  • 438 B (47 words) - 17:10, 30 November 2011
  • 9:30 AM Thurs 1-Dec-2011 CC L207 Thurs 1-Dec-2011 9:30am CC L207
    4 KB (604 words) - 07:12, 1 April 2015
  • Thursday, December 1, 2011
    884 B (124 words) - 04:56, 1 April 2015
  • [[Level 1 Group Members]] === Level 1 Trigger Goal ===
    4 KB (510 words) - 17:24, 30 July 2018
  • Wednesday February 1, 2012 at 11:00am ## Simon reported that currently about 1/2 of the reconstruction time is spent in the vertex section of the code---D
    6 KB (985 words) - 17:13, 24 February 2017
  • ...nstallation. Next cell (for third package): wire frame was laminated, type-1 cathode ready, working on the flaps for the type-2 cathode. For the nex wir ...mp is supposed to operate at ~100psi. The coolant (Fluorinert) is heavier (1.73g/cm^3) than watter.
    4 KB (754 words) - 19:30, 5 January 2012
  • ...on the third. First wire frame strung today, two end windows and one type-1 cathodes ready, working on two type-3 cathodes and started type-2. Dark cur
    4 KB (699 words) - 18:19, 12 January 2012
  • ...he wires. Could be also some garbage on the pulley or on the rod. One type-1 cathode is ready, two type-3 waiting for the daughter cards to be glued. Wi ...or the wires, and two cable types for the cathodes with 4 connectors: type-1 6 inches apart and type-2 5-8.5-4 inches distance between
    4 KB (651 words) - 17:51, 19 January 2012
  • 1:30 PM Wed 1-Feb-2012 CC F326 1:30 PM Wed 29-Feb-2012 CC F326 ('''Feb 29!''')
    5 KB (719 words) - 06:20, 1 April 2015
  • ...stringing, wire board #23 was laminated. Cathodes: the two type-3 two tyoe-1 and one type-2 ready. ...ber: you can apply the minimal threshold of 500nA and even if it trips at 1-2uA it is safe. There are CAEN modules (A1550) with the same connector conf
    5 KB (817 words) - 19:59, 26 January 2012
  • 3 KB (444 words) - 18:44, 1 March 2012
  • Thursday, March 1, 2012<br> * Tim proposed lengthening the long scintillators by 1 cm, so that the edges protrude another 0.5 cm. This is to make the clamp sh
    3 KB (530 words) - 17:13, 24 February 2017
  • March 1, 2012 FDC meeting ...air the oxygen in the chamber will be 10^4 cm^3. At 200 cm^3/min flow and 1% oxygen in the exhaust will have 2 cm^3/min oxygen. so it will take ~100 ho
    4 KB (660 words) - 17:22, 31 March 2015
  • ** +1-866-740-1260 : US and Canada ** +1-303-248-0285 : International
    4 KB (661 words) - 18:02, 31 March 2015
  • Friday June 1, 2012 at 8:15am
    1 KB (174 words) - 07:47, 1 June 2012
  • * +1-866-740-1260 : US+Canada * +1-303-248-0285 : International
    408 B (51 words) - 09:50, 1 June 2012
  • ** Dial: 1 888 240 2560 (US or Canada only)
    1 KB (163 words) - 17:04, 31 January 2016

Page text matches

  • ...tio of 80:1</u>. The electronic noise on the signal was on the level of 0.1&nbsp;pA. The signal disappeared immediately during beam interruptions, so ...y in Hall B during the current test run at 10&nbsp;nA corresponds to about 1% of the nominal GlueX operating intensity. If the Hall B beam spot on the
    6 KB (1,048 words) - 12:38, 14 March 2017
  • [[Image:Fcal_cw_test-1.jpg|400px|Production Cockroft-Walton Bases]]
    344 B (51 words) - 09:40, 3 July 2012
  • 1:30 PM Wed 27-Apr-2011 CC F326 1:30 PM Wed 25-May-2011 CC F326
    5 KB (852 words) - 17:54, 31 March 2015
  • ...'s measurements. The ratio is approximately 2. Therefore, the expected PDE@1.2V for the C20 is about 8.5/2 = 4.2. Carl measured it to be 4.4 &plusmn; 0. '''Conclusion:''' At the operating point of about 1.2 V above breakdown, the PDE for the C20 (1mm2, 17% fill factor) SiPM is ab
    4 KB (617 words) - 12:39, 14 March 2017
  • 1.) dial:
    3 KB (474 words) - 17:13, 24 February 2017
  • ...s://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=819 BCAL Module 1 Specs]
    4 KB (536 words) - 12:39, 14 March 2017
  • ...ee ticks used by single factory.</s><ref>This changed appeared in jana 0.6.1</ref> ...w 3rd parties to build using it.</s><ref>This changed appeared in jana 0.6.1</ref>
    17 KB (2,874 words) - 21:04, 29 November 2019
  • ...nergy resolution|Regina stand-alone BCal Monte Carlo simulation]] (ReSAM) [1],
    2 KB (360 words) - 17:00, 24 February 2017
  • # Review minutes from [[May 1, 2007 Software]] meeting 1.) dial:
    4 KB (725 words) - 17:13, 24 February 2017
  • * [[Level-1 Trigger]]
    4 KB (507 words) - 13:09, 8 July 2021
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    3 KB (426 words) - 17:13, 24 February 2017
  • * [[OWG Meeting 1-Jun-2016 | 1-Jun-2016]] * [[OWG Meeting 1-Jul-2015 | 1-Ju1-2015]]
    8 KB (746 words) - 09:18, 5 March 2018
  • ...dered for reducing the amount of material seen by forward-going particles [1,2]. These ideas have recently coalesced into one concrete proposal from th [[Image:radlen-img.gif|thumb|right|Figure 1: Cut view through the axis of the GlueX detector, showing the downstream en
    5 KB (708 words) - 12:40, 14 March 2017
  • May 29, 2007, Calorimetry meeting, 1:00 PM EDT [[Image:ReSAM samfrac 1.gif|thumb|100px|left|'Low Energy MC SF Resolution']]
    4 KB (640 words) - 17:12, 24 February 2017
  • * [[PID Day 1 Notes]]
    6 KB (746 words) - 12:40, 14 March 2017
  • ...parallel to the floor). The counters were 10cm wide and ~40 cm long, and ~1/4" thick. Unfortunately we did not take and pictures of the setup. The
    2 KB (299 words) - 11:33, 31 March 2015
  • The default step size set for materials when AUTO is off is 1 cm. This default is assigned in the hdds-geant TRIG 1
    9 KB (1,354 words) - 13:55, 13 November 2012
  • ...note2.pdf Gluex-doc-827-v3]: sampling fraction fluctuations from 10 MeV to 1 GeV (See Fig. 12 and 13)
    857 B (110 words) - 12:38, 14 March 2017
  • Note that allotted times are very generous. ''Speakers should plan on using 1/2 of the time for a presentation. The remainder can be used for additional ** 12:30 - 1:30: Lunch
    3 KB (335 words) - 12:40, 14 March 2017
  • 1.) dial: ...population of the phase space in the region of &theta;=1<sup>o</sup> and p=1 GeV/c.
    3 KB (443 words) - 12:40, 14 March 2017

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)