Difference between revisions of "Hall D Runs"
From Hall D Ops Wiki
(→Running) |
(→Commissioning) |
||
Line 20: | Line 20: | ||
==Commissioning== | ==Commissioning== | ||
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run Spring 2016] | *[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run Spring 2016] | ||
− | |||
**[https://halldweb.jlab.org/DocDB/0030/003009/001/Spring16_run_summary.pdf Summary of the Spring 2016 run (and the Fall 2015 run) given at the GlueX collaboration meeting, May 2016.] | **[https://halldweb.jlab.org/DocDB/0030/003009/001/Spring16_run_summary.pdf Summary of the Spring 2016 run (and the Fall 2015 run) given at the GlueX collaboration meeting, May 2016.] | ||
Line 32: | Line 31: | ||
*[[Fall 2014 | 2014 Fall Commissioning Plan]] | *[[Fall 2014 | 2014 Fall Commissioning Plan]] | ||
− | |||
**[https://halldweb.jlab.org/DocDB/0026/002649/001/Fall14_run_summary.pdf Fall 2014: Summary report given at the GlueX collaboration meeting, Feb. 2015.] | **[https://halldweb.jlab.org/DocDB/0026/002649/001/Fall14_run_summary.pdf Fall 2014: Summary report given at the GlueX collaboration meeting, Feb. 2015.] |
Revision as of 10:06, 19 April 2019
Running
- Fall 2016 GlueX Run (Engineering)