Difference between revisions of "Short Term Run Plan"
(→Run conditions) |
|||
Line 10: | Line 10: | ||
** one quadrant is OFF (crate CDC1) | ** one quadrant is OFF (crate CDC1) | ||
** Alarm on HD:coda:cdc:p_diff, barometric pressure has changed by 0.1 kPa or more since the start of the run,see https://logbooks.jlab.org/comment/38202#comment-38202 | ** Alarm on HD:coda:cdc:p_diff, barometric pressure has changed by 0.1 kPa or more since the start of the run,see https://logbooks.jlab.org/comment/38202#comment-38202 | ||
− | |||
== Run conditions == | == Run conditions == | ||
Line 20: | Line 19: | ||
DAQ config | DAQ config | ||
− | * setup hd_all.tsg_CPP | + | * setup: hd_all.tsg_CPP |
− | * production config FCAL_BCAL_PS.CPP_m9.conf | + | * production: config FCAL_BCAL_PS.CPP_m9.conf |
+ | * (raw mode: config FCAL_BCAL_PS.CPP_m10.conf) | ||
+ | |||
+ | == Run plan == | ||
'''Sun, Jun 12, 2022, Early Riser''' | '''Sun, Jun 12, 2022, Early Riser''' | ||
Line 30: | Line 32: | ||
* runs are 2 hours | * runs are 2 hours | ||
− | == Shift | + | == Shift duties == |
− | GlueX Guidelines are at [[Shift_Guidelines_for_Shift_Leader]] | + | GlueX Guidelines are at [[Shift_Guidelines_for_Shift_Leader]] and [[Guidelines_for_Remote_Worker_Shift]] |
=== run comment === | === run comment === | ||
Line 59: | Line 61: | ||
** '''BANU values''' < 5 minutes may be set to 0 | ** '''BANU values''' < 5 minutes may be set to 0 | ||
** '''UED:''' unplanned experiment down (hardware failure) | ** '''UED:''' unplanned experiment down (hardware failure) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== shift checklist === | === shift checklist === | ||
Line 86: | Line 73: | ||
log per run, [[Slow_Controls_Shift#EPICS_Control_Screens]] | log per run, [[Slow_Controls_Shift#EPICS_Control_Screens]] | ||
+ | |||
+ | == Special instructions == | ||
+ | |||
+ | === Hall Delta === | ||
+ | |||
+ | It's good practice to refer to our hall as Delta when talking to MCC, to make sure that there is no acoustic confusion between us and Hall B. | ||
== After beam restoration == | == After beam restoration == | ||
− | |||
* see [[Beam_Line_Detectors_Shift#Collimator_and_Radiators]] on how to move radiators and collimator | * see [[Beam_Line_Detectors_Shift#Collimator_and_Radiators]] on how to move radiators and collimator | ||
Line 99: | Line 91: | ||
* our '''harp scans''': follow the instructions in [[Beam_Line_Detectors_Shift#Radiator_Harp_Scan]] | * our '''harp scans''': follow the instructions in [[Beam_Line_Detectors_Shift#Radiator_Harp_Scan]] | ||
* use the '''harp scan extrapolation''' tool [http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi] and post screenshots of the plots into the logbook (eg https://logbooks.jlab.org/entry/3929556). | * use the '''harp scan extrapolation''' tool [http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi] and post screenshots of the plots into the logbook (eg https://logbooks.jlab.org/entry/3929556). | ||
− | |||
− | == | + | === Target status === |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
* check camera west-cam.jlab.org, select Target view, if necessary | * check camera west-cam.jlab.org, select Target view, if necessary | ||
Line 113: | Line 98: | ||
* yellow flag visible: target IN | * yellow flag visible: target IN | ||
− | |||
=== rootspy === | === rootspy === | ||
Line 122: | Line 106: | ||
Call the expert. In case they suggest that you restart the DAQ, find information at [[Data_Acquisition_Shift]]. | Call the expert. In case they suggest that you restart the DAQ, find information at [[Data_Acquisition_Shift]]. | ||
− | === | + | === Timing problems === |
If there are any, please add sdobbs@jlab.org to the notifications in the logbook entry. | If there are any, please add sdobbs@jlab.org to the notifications in the logbook entry. | ||
Line 134: | Line 118: | ||
Keep an eye out for the PS and/or PSC scalers freezing. If it happens, then step 2+3 of the instructions 'Run PS Scalers' at [[Pair_Spectrometer_Shift]] can be followed to reset them, it has to be done on gluon100. | Keep an eye out for the PS and/or PSC scalers freezing. If it happens, then step 2+3 of the instructions 'Run PS Scalers' at [[Pair_Spectrometer_Shift]] can be followed to reset them, it has to be done on gluon100. | ||
+ | <!-- === AI for CDC HV === | ||
+ | For FULL target runs only, set the CDC HV before the start of each run using the value suggested by the AI. | ||
+ | * There are instructions here https://wiki.jlab.org/epsciwiki/index.php/PrimEx_instructions | ||
+ | * The AI uses measurements from epics averaged over the last minute, so the AI should be used just before starting a run, when the beam current is at its target value and has been steady for the past minute. | ||
+ | * If for any reason this proves to be problematic, please revert to the nominal HV, 2125V, and contact Naomi. | ||
+ | * for '''full target''' runs set the '''CDC HV''' before the start of each run using the value suggested by the AI. (see below [[Short_Term_Run_Plan#AI_for_CDC_HV]] for more info) | ||
+ | * for '''empty target''' runs, keep the CDC HV at 2125V''' | ||
--> | --> |
Revision as of 05:46, 13 June 2022
Contents
Current Experiment
Measuring the Charged Pion Polarizability in the γγ -> π+π- reaction
- Experiment number: E12-13-008 (use in BTA shift information)
- Proposal: PAC link
Notes
- ST: not installed
- CDC
- one quadrant is OFF (crate CDC1)
- Alarm on HD:coda:cdc:p_diff, barometric pressure has changed by 0.1 kPa or more since the start of the run,see https://logbooks.jlab.org/comment/38202#comment-38202
Run conditions
Hall D counting room white board
- Radiator JD70-103
- Collimator 3.4 mm
- TPOL converter 750 um
DAQ config
- setup: hd_all.tsg_CPP
- production: config FCAL_BCAL_PS.CPP_m9.conf
- (raw mode: config FCAL_BCAL_PS.CPP_m10.conf)
Run plan
Sun, Jun 12, 2022, Early Riser
production runs with improved trigger
- Target status: Pb target IN
- beam current 60 nA
- runs are 2 hours
Shift duties
GlueX Guidelines are at Shift_Guidelines_for_Shift_Leader and Guidelines_for_Remote_Worker_Shift
run comment
Put information, eg "production 25 nA Pb", in the run comment window of the DAQ. This comment is needed for RCDB.
The run comment window should appear automatically after a run has been started. Enter the comment and SAVE, do not exit.
list of production runs
- Include a separate list of the runs taken during the shift at the end of the summary (for example, see https://logbooks.jlab.org/entry/3936066)
strip charts
- Log the strip charts of beam current and position, see Slow_Controls_Shift#MYA_Archiver
- on a gluon machine type myaPlot
- right-click on the blank space of the myaPlot screen and select "Clone in new LivePlot"
- right-click on the screen and select "Load a Configuration"
- the configuration "beam_conditions" provides the beam current and position information
- right-click on the screen and select "Make Elog Entry", make sure you do not log to ELOG but to HDLOG.
BTA sheet
- The BTA guidelines are at BTA_guidelines.
After loading the EPICS values, you may change the values, eg round them up or down.- BANU values >= 5 minutes must be reflected in the PCC value (else the aftermath doesnt work out for RC)
- BANU values < 5 minutes may be set to 0
- UED: unplanned experiment down (hardware failure)
shift checklist
log per shift, Shift_Checklist
data monitoring plots
log per run, Online_Monitoring_Shift
screen shot of CSS GlueX Overview
log per run, Slow_Controls_Shift#EPICS_Control_Screens
Special instructions
Hall Delta
It's good practice to refer to our hall as Delta when talking to MCC, to make sure that there is no acoustic confusion between us and Hall B.
After beam restoration
- see Beam_Line_Detectors_Shift#Collimator_and_Radiators on how to move radiators and collimator
- check the radiation levels without radiator and then with the radiator
- see the whiteboard (bottom RHS corner of the RH board) - there are columns of values expected without and with the radiator
- retract the radiator
- collimator in blocking position
- ask MCC to do their harp scan
- our harp scans: follow the instructions in Beam_Line_Detectors_Shift#Radiator_Harp_Scan
- use the harp scan extrapolation tool http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi and post screenshots of the plots into the logbook (eg https://logbooks.jlab.org/entry/3929556).
Target status
- check camera west-cam.jlab.org, select Target view, if necessary
- look for yellow (small) flag as in https://halldweb.jlab.org/hdops/wiki/images/3/34/Lead_target.gif
- yellow flag visible: target IN
rootspy
If you have to restart rootspy, Online_Monitoring_Shift#Routine_Operation, and it crashes, you might have to restart the monitoring process, find help at Online_Monitoring_Shift#Starting_and_stopping_the_Monitoring_System.
DAQ issues
Call the expert. In case they suggest that you restart the DAQ, find information at Data_Acquisition_Shift.
Timing problems
If there are any, please add sdobbs@jlab.org to the notifications in the logbook entry.
Example double timing peaks: https://logbooks.jlab.org/entry/3933110
Shoulders on timing peaks might be features and not problems: https://logbooks.jlab.org/entry/3933867
PS and/or PSC scalers freezing
Keep an eye out for the PS and/or PSC scalers freezing. If it happens, then step 2+3 of the instructions 'Run PS Scalers' at Pair_Spectrometer_Shift can be followed to reset them, it has to be done on gluon100.