*'''Preparation of parts for FCAL2 modules''' -- Sasha | *'''Preparation of parts for FCAL2 modules''' -- Sasha | ||
+ | ** Received 20 + 8 CRYTUR crystals during this week [https://halldweb.jlab.org/wiki/index.php/CRYTUR] | ||
+ | *** Expect to receive 25 more CRYTUR crystals from physics division by the end of this year | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 786 ] | ||
+ | *** Available for wrapping: 14 crystals were wrapped during last week | ||
+ | *** Mindy (DSG group) continues wrapping crystals | ||
+ | *** Mindy will start soldering wires to sockets (short meeting with Chris and Mindy) | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
− | * '''Testing of PMT dividers''' -- Sasha / Arshak | + | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] |
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 1362 </span> (14 modules fabricated since last week) | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 767 CRYTUR], available: 10 | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] | ||
+ | * '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | ||
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak | * '''Installation of the FCAL2 detector''' -- Sasha / Arshak | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/November_16,_2022_FCAL_Insert_Installation_Meeting] | ||
+ | ** Detector cabling and patch panels for the FCAL insert | ||
+ | ** Manpower and division of tasks | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
* '''Light Monitoring System''' -- Arshak | * '''Light Monitoring System''' -- Arshak | ||
* '''Simulations/Analysis''' | * '''Simulations/Analysis''' |
Revision as of 09:34, 9 December 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Received 20 + 8 CRYTUR crystals during this week [1]
- Expect to receive 25 more CRYTUR crystals from physics division by the end of this year
- Wrapped CRYTUR crystals: 786
- Available for wrapping: 14 crystals were wrapped during last week
- Mindy (DSG group) continues wrapping crystals
- Mindy will start soldering wires to sockets (short meeting with Chris and Mindy)
- List of available parts
- Received 20 + 8 CRYTUR crystals during this week [1]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1362 (14 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [2]
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Light Monitoring System -- Arshak
- Simulations/Analysis