Difference between revisions of "2012-10-31"
From GlueXWiki
(→Reports from Technical Groups: start counter) |
(→Reports from Technical Groups: software, dc) |
||
Line 65: | Line 65: | ||
* DAQ/Monitoring/Controls [[OWG Meeting 12-Sep-2012 |September 12, 2012]] | * DAQ/Monitoring/Controls [[OWG Meeting 12-Sep-2012 |September 12, 2012]] | ||
* Offline | * Offline | ||
− | ** Software Meeting [[GlueX Offline Meeting, | + | ** Software Meeting [[GlueX Offline Meeting, October 17, 2012#Minutes|October 17, 2012]] |
− | ** Data Challenge [[GlueX Data Challenge Meeting, October | + | ** Data Challenge [[GlueX Data Challenge Meeting, October 22, 2012|October 22, 2012]] |
* Photon Beam and Tagger [[BLTWG Meeting 15/10/2012|October 15, 2012]] | * Photon Beam and Tagger [[BLTWG Meeting 15/10/2012|October 15, 2012]] | ||
* Physics [[September 10, 2012 (11:30AM), Physics Working Group|September 10, 2012]] | * Physics [[September 10, 2012 (11:30AM), Physics Working Group|September 10, 2012]] | ||
=== AOT === | === AOT === |
Revision as of 14:01, 30 October 2012
Contents
Meeting Time and Place
The meeting will be on Wednesday October 31, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
Announcements
Action Items
- TDR Editor
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
- UCONN
Technical Design Report
Reports from Technical Groups
- Calorimeters
- Beam Tests
- Calorimetry October 9, 2012
- BCAL Readout October 16, 2012
- Tracking September 12, 2012
- CDC
- FDC
- PID
- TOF October 25, 2012
- Start Counter October 18, 2012
- PID Upgrades September 17, 2012
- Engineering
- Magnet
- Target
- Engineering Activities
- Electronics
- Technical Design Report
- Trigger September 12, 2012
- DAQ/Monitoring/Controls September 12, 2012
- Offline
- Software Meeting October 17, 2012
- Data Challenge October 22, 2012
- Photon Beam and Tagger October 15, 2012
- Physics September 10, 2012