File list
From GlueXWiki
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
07:47, 8 May 2020 | Rolf's guidance.docx (file) | 14 KB | 1 | ||
07:41, 8 May 2020 | Va metrics for reopening.pdf (file) | 1.64 MB | 1 | ||
10:49, 7 May 2020 | Rory's slides.pdf (file) | 610 KB | clearance issues | 1 | |
08:46, 7 May 2020 | CPP Procurement schedule.docx (file) | 13 KB | rough guess at FY2020 procurements | 1 | |
08:34, 7 May 2020 | CPP stand iso.pdf (file) | 99 KB | with adjustments | 1 | |
08:28, 7 May 2020 | CPP install schedule.pdf (file) | 161 KB | preliminary install schedule based on WAG assumptions | 1 | |
07:58, 6 May 2020 | Beam Resumption plan.docx (file) | 21 KB | Mark's written plan for resuming beam operations if needed | 1 | |
07:52, 6 May 2020 | Physics mtg.png (file) | 522 KB | physics senior staff | 1 | |
07:13, 4 May 2020 | Smitty HVAC.png (file) | 925 KB | smitty evaluation of HVAC and COVID-19 | 1 | |
07:39, 1 May 2020 | Accelerator return plan.pdf (file) | 83 KB | accel plan if we run beam this summer | 1 | |
13:07, 23 April 2020 | Rory's screen shots.pdf (file) | 1.13 MB | screenshots for dicussion | 1 | |
06:45, 22 April 2020 | Mark's return plan.pdf (file) | 434 KB | 1st cut of plan to bring hall back to beam operations | 1 | |
14:13, 21 April 2020 | Rolf's notes.jpg (file) | 267 KB | Rolf's notes from this week | 1 | |
14:10, 21 April 2020 | Smitty's take.jpg (file) | 226 KB | brief by Dr. Chandler on his opinions | 1 | |
08:22, 17 April 2020 | MEDCON6 Return-plan.pdf (file) | 200 KB | preliminary return plan from accelerator mtg | 1 | |
08:10, 17 April 2020 | Reopen-plan.pdf (file) | 911 KB | fed plan | 1 | |
06:34, 8 April 2020 | Training online.pdf (file) | 660 KB | available online training to JLAB employees | 1 | |
06:23, 8 April 2020 | Training.pdf (file) | 228 KB | possible training sources | 1 | |
12:49, 2 April 2020 | Muon Chamber dimensions.pdf (file) | 4.21 MB | Rory's picture with dimensions | 1 | |
09:09, 2 April 2020 | Muon Chamber Shielding.pdf (file) | 475 KB | Rory's description of electronics shielding and grounding | 1 | |
14:13, 7 February 2020 | Alarm.pdf (file) | 71 KB | DIRC Alarms | 1 | |
14:02, 7 February 2020 | TaggerVac.png (file) | 33 KB | Tagger turbo excursion | 1 | |
15:24, 30 January 2020 | G10 PMT Capture plate.pdf (file) | 46 KB | G10 | 1 | |
15:23, 30 January 2020 | Jacking plate.pdf (file) | 55 KB | brass | 1 | |
15:23, 30 January 2020 | Upstream plate.pdf (file) | 48 KB | brass module plate | 1 | |
10:33, 15 January 2020 | CPP Installation Concept.pdf (file) | 199 KB | concept for installing CPP detector partially inside the FCAL dark room | 1 | |
14:54, 10 January 2020 | FCAL2 cross section.jpg (file) | 192 KB | section | 1 | |
16:22, 9 December 2019 | FCAL Insert Module installation procedure.pdf (file) | 2.25 MB | preliminary assembly sequence for the FCAL insert | 1 | |
14:16, 6 December 2019 | CPP Concept.pdf (file) | 199 KB | sketch of CPP concept incursion on FCAL darkroom | 1 | |
14:03, 6 December 2019 | Accel schedule.pdf (file) | 705 KB | 2019-2020 | 1 | |
12:31, 28 October 2019 | Module installation procedure.pdf (file) | 3.1 MB | Preliminary procedure outlining the steps to assemble the complete detector | 1 | |
09:15, 9 October 2019 | TOF ASSY.jpg (file) | 2.73 MB | 1 | ||
11:18, 30 September 2019 | SamtekHV.pdf (file) | 853 KB | 1 | ||
11:16, 30 September 2019 | Radiall connector.pdf (file) | 19 KB | HV cable connector 48 pin | 1 | |
08:59, 25 September 2019 | TOFII.jpg (file) | 271 KB | progress | 1 | |
08:43, 25 September 2019 | TOF pmt.jpg (file) | 1.1 MB | upper center pmt mismatch | 1 | |
15:13, 24 September 2019 | 1020 shield.pdf (file) | 86 KB | 6mm longer shield for module mag field test FCAL insert | 1 | |
15:11, 24 September 2019 | Steel shield.pdf (file) | 69 KB | mag shield box for testing pmts | 1 | |
14:58, 24 September 2019 | Acrylic sheet.pdf (file) | 38 KB | 1/2"sheet with bevelled edges | 1 | |
14:14, 19 August 2019 | Particle trajectory through BCAL.pdf (file) | 308 KB | particle trajectory grazing BCAL | 1 | |
15:52, 14 August 2019 | 40x40 crystal matrix layout.pdf (file) | 1.2 MB | geometry of layout | 1 | |
10:17, 30 July 2019 | Cooling-compression Iso.jpg (file) | 50 KB | cooling plate | 1 | |
10:17, 30 July 2019 | Cooling Iso.jpg (file) | 201 KB | cooling | 1 | |
10:15, 30 July 2019 | Iso.png (file) | 341 KB | Iso | 1 | |
11:02, 29 July 2019 | Rohacel cut sheet.pdf (file) | 73 KB | rohacell properties | 1 | |
10:46, 29 July 2019 | 40x40 crystal matrix 2D layout.pdf (file) | 39 KB | 40x40 | 1 | |
10:42, 29 July 2019 | 32x32 crystal matrix 2D layout.pdf (file) | 38 KB | 32x32 | 3 | |
09:46, 9 August 2018 | OB install procedure.pdf (file) | 96 KB | 1 | ||
08:23, 19 July 2018 | Aug10 OB delivery.pdf (file) | 162 KB | 1 | ||
09:39, 27 June 2018 | DIRC BBox Flange seal.jpg (file) | 1.5 MB | jpg | 1 |
First page |
Previous page |
Next page |
Last page |