(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday September 18, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. =...") |
|||
Line 40: | Line 40: | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
* Calorimeters: | * Calorimeters: | ||
− | ** Calorimetry [[ | + | ** Calorimetry [[Sep 10, 2013 Calorimetry| September 10, 2013]] |
** BCAL Readout [[Aug 6,2013 Readout|August 6, 2013]] Last Meeting!! | ** BCAL Readout [[Aug 6,2013 Readout|August 6, 2013]] Last Meeting!! | ||
− | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-09- | + | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-09-17 | September 17, 2013]] |
− | * Tracking [[ | + | * Tracking [[September 11, 2013 tracking CDC/FDC| September 11, 2013]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
* PID | * PID | ||
** TOF [[GlueX TOF Meeting, August 29, 2013|August 29, 2013]] | ** TOF [[GlueX TOF Meeting, August 29, 2013|August 29, 2013]] | ||
− | ** Start Counter [[GlueX Start Counter Meeting, | + | ** Start Counter [[GlueX Start Counter Meeting, September 5, 2013#Minutes|September 5, 2013]] |
− | ** PID Upgrades [[ | + | ** PID Upgrades [[September 6, 2013 PID Upgrade|September 6, 2013]] |
* Engineering | * Engineering | ||
** Magnet | ** Magnet | ||
** Target | ** Target | ||
** Engineering Activities | ** Engineering Activities | ||
− | ** Installation [[ | + | ** Installation [[September 13, 2013 Installation|September 13, 2013 Installation]] |
* Electronics | * Electronics | ||
* Trigger | * Trigger | ||
− | ** Hardware (Level-1) [[OWG Meeting | + | ** Hardware (Level-1) [[OWG Meeting 11-Sep-2013 |September 11, 2013]] |
** Software (Level-3) [[September 3, 2013| September 3, 2013]] | ** Software (Level-3) [[September 3, 2013| September 3, 2013]] | ||
− | * DAQ/Monitoring/Controls [[OWG Meeting | + | * DAQ/Monitoring/Controls [[OWG Meeting 11-Sep-2013 |September 11, 2013]] |
* Offline [[GlueX Offline Meeting, August 21, 2013|August 21, 2013]] | * Offline [[GlueX Offline Meeting, August 21, 2013|August 21, 2013]] | ||
− | * Photon Beam and Tagger [[BLTWG Meeting | + | * Photon Beam and Tagger [[BLTWG Meeting 09/16/2013|September 16, 2013]] |
− | * Physics [[ | + | * Physics [[September 9, 2013, Physics Working Group|September 9, 2013]] |
Revision as of 12:46, 17 September 2013
Contents
Meeting Time and Place
The meeting will be on Wednesday September 18, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Solenoid Status
- Collaboration Meeting October 3-5, 2013.
- Trip to SLAC to discuss DIRC
- Online Data Challenge (Slides)
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Contracts
- UConn (Diamond)
Reports from Technical Groups
- Calorimeters:
- Calorimetry September 10, 2013
- BCAL Readout August 6, 2013 Last Meeting!!
- BCAL Reconstruction September 17, 2013
- Tracking September 11, 2013
- CDC
- FDC
- PID
- TOF August 29, 2013
- Start Counter September 5, 2013
- PID Upgrades September 6, 2013
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation September 13, 2013 Installation
- Electronics
- Trigger
- Hardware (Level-1) September 11, 2013
- Software (Level-3) September 3, 2013
- DAQ/Monitoring/Controls September 11, 2013
- Offline August 21, 2013
- Photon Beam and Tagger September 16, 2013