*** Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year | *** Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 795 ] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 795 ] | ||
− | *** Available for wrapping: | + | *** Available for wrapping: 30 crystals were wrapped during last week |
*** Mindy (DSG group) continues wrapping crystals | *** Mindy (DSG group) continues wrapping crystals | ||
*** Mindy will start soldering wires to sockets (short meeting with Chris and Mindy) | *** Mindy will start soldering wires to sockets (short meeting with Chris and Mindy) | ||
Line 14: | Line 14: | ||
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total | + | ** Fabricated modules: <span style="color:#FF0000"> Total 1371 </span> (9 modules fabricated since last week) |
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
− | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 767 CRYTUR], available: | + | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 767 CRYTUR], available: 30 |
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | * '''[[Testing of PMT dividers]]''' -- Sasha / Arshak |
Revision as of 09:44, 9 December 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Received 15 CRYTUR crystals during this week [1]
- Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year
- Wrapped CRYTUR crystals: 795
- Available for wrapping: 30 crystals were wrapped during last week
- Mindy (DSG group) continues wrapping crystals
- Mindy will start soldering wires to sockets (short meeting with Chris and Mindy)
- List of available parts
- Received 15 CRYTUR crystals during this week [1]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1371 (9 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [2]
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Light Monitoring System -- Arshak
- Simulations/Analysis