*'''Preparation of parts for FCAL2 modules''' -- Sasha  
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
 +
** Received 15  CRYTUR crystals during this week [https://halldweb.jlab.org/wiki/index.php/CRYTUR]
 +
*** Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year
 +
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 795 ]
 +
*** 9 crystals wrapped during last week
 +
*** Available for wrapping: 30 crystals
 +
*** Mindy (DSG group) continues wrapping crystals
 +
*** Mindy will start soldering wires to sockets (short meeting with Chris and Mindy)
 +
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
 
* '''Module fabrication'''  -- Sasha
 
* '''Module fabrication'''  -- Sasha
 +
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 +
** Fabricated modules: <span style="color:#FF0000"> Total 1371 </span> (9 modules fabricated since last week)
 +
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS]
 +
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 795 CRYTUR], available: 30
 +
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)]
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Arshak
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Arshak
 
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak
 
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak
 +
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 +
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/November_16,_2022_FCAL_Insert_Installation_Meeting]
 +
** Detector cabling and patch panels for the FCAL insert
 +
** Manpower and division of tasks
 +
** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students]
 
* '''Light Monitoring System''' -- Arshak
 
* '''Light Monitoring System''' -- Arshak
 +
**BEAM tests for checking cross talks
 +
***Prototype pic at PS test stand https://userweb.jlab.org/~aasatury/Fcal_LMS/beam_test/20221207_171308.jpg
 +
***https://userweb.jlab.org/~aasatury/Fcal_LMS/beam_test/20221207_171325.jpg
 +
** Very 1st Results
 +
***https://userweb.jlab.org/~aasatury/Fcal_LMS/beam_test/3_by_3.gif
 +
***https://userweb.jlab.org/~aasatury/Fcal_LMS/beam_test/4_5_6.gif
 
* '''Simulations/Analysis'''
 
* '''Simulations/Analysis'''
 +
 +
=Minutes=
 +
Attendees: Sasha, Arshak, Phil, Igal, Malte, Jane, Jon, Liping, Azizah, Bill, Zisis, Axel, S.T.
 +
* Arshak presented progress on measuring cross talk due to LMS plexiglas plate using 3x3 setup in PS test stand in hall
 +
** PbW04 module in center, dummies with just ESR wrapping on left and right, long light guides on top and bottom
 +
** Front face blocked on one side of center, open on other side
 +
** Light guides still present for dummies
 +
** Secondary lepton beam hits ~center of crystal, in coincidence with PS tile
 +
*** Could be centered a little better
 +
** Almost the same amplitudes of signals on left and right tubes = almost no cross talk
 +
*** Small asymmetry is seen -- suggest swapping which face is closed
 +
*** Could do test without light guides on left and right
 +
*** Look at energy distribution of possible cross talk?
 +
** Redo test with a true 3x3 prototype of crystals?
 +
* COMCAL will be disassembled next year -- leave a 5x5 array for tests with new PMT dividers?
 +
* Still continuing to receive Crytur crystals, expect more by end of year, and expect new batch in May of next year
 +
* Wrapping of existing crystals continues -- 30 more to go
 +
* Mindy from detector support group soldering wires to PMT sockets
 +
* Inventory of parts needed for module fabrication looks good
 +
* Grand total fabricated modules = 1371, hope for 1400 by end of year
 +
* Bench tests for PMT dividers (two versions: bypassed amplifier and 3x amplifier) ongoing
 +
** Concern: NPS experience with higher gain amplifier (20x vs 3x) = large noise level, 200 MHz frequency -- do we need to be concerned?  Probably not due to smaller gain amplifier
 +
** Noise tests inside FCAL dark room
 +
*** With bypassed amplifier: FCAL HV off: low noise;  FCAL HV on: some noise spikes
 +
*** With 3x amplifer:  see CANBUS activity and higher amplitude noise level with FCAL HV off, increases with FCAL HV on
 +
**** Still looks like ~3 mV threshold should be possible
 +
*** Bring 3x3 crystal prototype into dark room?
 +
*** Use shielded cables for CANBUS?
 +
* Need to give green light to Fernando regarding PMT divider order soon
 +
* Patch panel design:  separation of HV and LV
 +
* List of summer students is growing:
 +
** 2 from Lamar, 2 from URegina, up to 4 from UNCW, 1 from GWU
 +
** Lab will support students at some level
 +
** Sasha anticipates needing 11 students for 3 months

Latest revision as of 10:24, 16 December 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Sasha, Arshak, Phil, Igal, Malte, Jane, Jon, Liping, Azizah, Bill, Zisis, Axel, S.T.

  • Arshak presented progress on measuring cross talk due to LMS plexiglas plate using 3x3 setup in PS test stand in hall
    • PbW04 module in center, dummies with just ESR wrapping on left and right, long light guides on top and bottom
    • Front face blocked on one side of center, open on other side
    • Light guides still present for dummies
    • Secondary lepton beam hits ~center of crystal, in coincidence with PS tile
      • Could be centered a little better
    • Almost the same amplitudes of signals on left and right tubes = almost no cross talk
      • Small asymmetry is seen -- suggest swapping which face is closed
      • Could do test without light guides on left and right
      • Look at energy distribution of possible cross talk?
    • Redo test with a true 3x3 prototype of crystals?
  • COMCAL will be disassembled next year -- leave a 5x5 array for tests with new PMT dividers?
  • Still continuing to receive Crytur crystals, expect more by end of year, and expect new batch in May of next year
  • Wrapping of existing crystals continues -- 30 more to go
  • Mindy from detector support group soldering wires to PMT sockets
  • Inventory of parts needed for module fabrication looks good
  • Grand total fabricated modules = 1371, hope for 1400 by end of year
  • Bench tests for PMT dividers (two versions: bypassed amplifier and 3x amplifier) ongoing
    • Concern: NPS experience with higher gain amplifier (20x vs 3x) = large noise level, 200 MHz frequency -- do we need to be concerned? Probably not due to smaller gain amplifier
    • Noise tests inside FCAL dark room
      • With bypassed amplifier: FCAL HV off: low noise; FCAL HV on: some noise spikes
      • With 3x amplifer: see CANBUS activity and higher amplitude noise level with FCAL HV off, increases with FCAL HV on
        • Still looks like ~3 mV threshold should be possible
      • Bring 3x3 crystal prototype into dark room?
      • Use shielded cables for CANBUS?
  • Need to give green light to Fernando regarding PMT divider order soon
  • Patch panel design: separation of HV and LV
  • List of summer students is growing:
    • 2 from Lamar, 2 from URegina, up to 4 from UNCW, 1 from GWU
    • Lab will support students at some level
    • Sasha anticipates needing 11 students for 3 months