Search results

From GlueXWiki
Jump to: navigation, search
  • Here is a diagram made by Chris Cuevas of the cabling for the BCAL test. This focuses mainly on what is needed in
    5 KB (835 words) - 15:55, 29 August 2006
  • ...0ns and 250->310ns. The longer, actual length is to our advantage. Chris Cuevas will assit in getting a fast trigger cable from the tagger MOR to the Alcov
    4 KB (618 words) - 11:43, 1 August 2006
  • Cuevas.
    2 KB (326 words) - 11:59, 11 April 2007
  • Chris Cuevas has arranged for someone in the Accelerator Group
    1 KB (165 words) - 11:57, 11 April 2007
  • on a g10 backing. Brian (and Chris Cuevas) believe that this will
    3 KB (389 words) - 11:56, 11 April 2007
  • ink for the FDC ground planes. Chris Cuevas has no real preference
    2 KB (336 words) - 11:55, 11 April 2007
  • with Chris Cuevas and Elton regarding who will work on the FDC
    1 KB (206 words) - 11:53, 11 April 2007
  • tests. He has been in communication with Chris Cuevas who will
    2 KB (346 words) - 11:51, 11 April 2007
  • DSC reported that he had talked to Chris Cuevas about modifications
    6 KB (986 words) - 12:43, 7 December 2006
  • DSC reported that he had talked to Chris Cuevas about modifications
    6 KB (976 words) - 12:04, 11 April 2007
  • called HVPF that Chris Cuevas was talking about for Hall B. This
    5 KB (821 words) - 09:06, 12 April 2007
  • will discuss this with Chris Cuevas at some point and will look
    4 KB (639 words) - 09:07, 12 April 2007
  • ...nline_9Aug07.ppt Role of JLab Electronics group in Hall D online] - Chris Cuevas
    5 KB (870 words) - 13:55, 27 August 2007
  • '''Chris Cuevas gave an update on electronics:'''
    4 KB (638 words) - 12:39, 14 March 2017
  • '''Chris Cuevas showed the latest electronics diagrams'''
    5 KB (712 words) - 15:31, 6 February 2008
  • * Introduction to ATCA (see [[Media:Chris_ATCA_15Feb08.ppt]])- Chris Cuevas
    4 KB (629 words) - 15:10, 27 February 2008
  • Trigger Network System drawings posted by Chris Cuevas
    2 KB (254 words) - 12:40, 14 March 2017
  • #* Discussion with C. Cuevas & Co.
    6 KB (892 words) - 17:14, 24 February 2017
  • we can get manpower if needed through Chris Cuevas' group so that delays
    9 KB (1,520 words) - 17:12, 24 February 2017
  • Cuevas' group so that delays on the wire board Phase 2 soldering and
    10 KB (1,597 words) - 17:14, 24 February 2017
  • needed through Chris Cuevas' group so that delays on the wire board
    12 KB (1,957 words) - 17:12, 24 February 2017
  • Dave Abbott and Chris Cuevas attended the conference a week or so ago. See Chris' slides above. Some h
    4 KB (730 words) - 10:18, 28 May 2009
  • *: Chris Cuevas cuevas@jlab.org
    1 KB (155 words) - 12:40, 14 March 2017
  • ...pstick,eugenio,klein,abbottd,doughty,boeglinw,chandra,kornicer,pavel,brash,cuevas,jastrzem,barbosa,bellis,saw,carman,gurjyan,timmer,biselli,kuhnj,zisis,aamer
    2 KB (298 words) - 10:41, 1 July 2009
  • ...doc-private/DocDB/ShowDocument?docid=1341 Trigger Hardware Status] - Chris Cuevas
    10 KB (1,422 words) - 12:39, 14 March 2017
  • ...its since Steve Lassiter found Dataforth modules which should work. Chris Cuevas really does not want to make any new boards or modules, as his guys are swa
    2 KB (319 words) - 16:02, 30 September 2009
  • ...jlab.org/doc-private/DocDB/ShowDocument?docid=1399 Trigger status] - Chris Cuevas
    8 KB (1,070 words) - 12:40, 14 March 2017
  • * Sasha reported that Chris Cuevas will send a flash ADC to FSU, and perhaps a VXS crate.
    5 KB (710 words) - 06:51, 1 April 2015
  • ...org/doc-public/DocDB/ShowDocument?docid=1501 Trigger development] - Chris Cuevas
    12 KB (1,580 words) - 12:40, 14 March 2017
  • # Visser, G., Abbot, D., Barbosa, F., Cuevas, C., Hai Dong, Jastrzembski, E., Moffit, B. and Raydo, B.''A 72 channel 125 # Visser, G., Abbot, D., Barbosa, F., Cuevas, C., Hai Dong, Jastrzembski, E., Moffit, B. and Raydo, B.''A 72 channel 125
    19 KB (2,649 words) - 15:13, 11 July 2023
  • *: Chris Cuevas cuevas@jlab.org
    961 B (124 words) - 10:03, 16 June 2010
  • ...org/doc-public/DocDB/ShowDocument?docid=1554 Welcome and Overview ] (Chris Cuevas) *: Chris Cuevas [mailto:cuevas@jlab.org]
    2 KB (285 words) - 16:54, 24 February 2017
  • ....jlab.org/doc-public/DocDB/ShowDocument?docid=1590 Trigger update] - Chris Cuevas
    12 KB (1,612 words) - 12:38, 14 March 2017
  • ...blic/DocDB/ShowDocument?docid=1679 Status of Trigger Electronics] - Chris Cuevas
    9 KB (1,174 words) - 12:39, 14 March 2017
  • .../001908/001/GlueXMeeting_Trigger_Feb2012.pptx Trigger Electronics] - Chris Cuevas
    10 KB (1,269 words) - 12:39, 14 March 2017
  • ...DocDB/ShowDocument?docid=1735 Trigger Electronics] - Dave Abbott for Chris Cuevas
    11 KB (1,384 words) - 17:13, 24 February 2017
  • ...eXMeeting_Trigger_OCT2012.pptx Update on the Trigger Electronics] -- Chris Cuevas
    10 KB (1,216 words) - 12:38, 14 March 2017
  • ...GlueXMeeting_Trigger_May2012.pptx Update on the Trigger Hardware ] - Chris Cuevas
    10 KB (1,238 words) - 12:38, 14 March 2017
  • ...eXMeeting_Trigger_FEB2013.pptx Update on the Trigger Electronics] -- Chris Cuevas -- Scott Kaneta
    8 KB (1,048 words) - 12:39, 14 March 2017
  • ...eXMeeting_Trigger_JUN2013.pptx Update on the Trigger Electronics] -- Chris Cuevas
    9 KB (1,108 words) - 12:38, 14 March 2017
  • ...01/GlueXMeeting_Trigger_FEB2014.pptx Trigger Electronics Update] --- Chris Cuevas
    10 KB (1,265 words) - 12:39, 14 March 2017
  • ...ueXMeeting_Trigger_OCT2013.pptx Update on the Trigger Electronics] - Chris Cuevas
    10 KB (1,327 words) - 12:38, 14 March 2017
  • ## David: Chris Cuevas says that the Matt's algorithm (see his [http://www.sciencedirect.com/scien
    3 KB (468 words) - 12:02, 21 March 2013
  • Trigger and DAQ [Elliott]: Chris Cuevas will measure trigger fiber cables lengths once the cable trays are installe
    5 KB (765 words) - 07:03, 1 April 2015
  • ...01/GlueXMeeting_Trigger_MAY2014.pptx Trigger electronics update] --- Chris Cuevas
    10 KB (1,231 words) - 12:38, 14 March 2017
  • .../GlueXMeeting_Trigger_OCT2014.pptx Level-1 hardware update] --- Chris Cuevas
    9 KB (1,171 words) - 12:38, 14 March 2017
  • * '''JLab''': Chris Cuevas, William Gu, Mark Ito (chair), Ben Raydo, Sascha Somov
    5 KB (789 words) - 01:13, 1 April 2015
  • Chris Cuevas <cuevas@jlab.org>,
    3 KB (503 words) - 13:29, 3 November 2014
  • ...ctor. Brian will need help for the PCB design and manufacturing from Chris Cuevas and Fernando's people.
    3 KB (434 words) - 19:05, 8 July 2016
  • ** maybe 2 people from Cuevas to help with unstacking and stacking
    4 KB (642 words) - 07:38, 21 October 2022

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)