User contributions
(newest | oldest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
- 06:09, 14 August 2018 (diff | hist) . . (+162) . . Fall 2018 GlueX Run (→Beam and Hall configuration)
- 05:55, 14 August 2018 (diff | hist) . . (+1) . . m Fall 2018 GlueX Run (→Beam and Hall configuration)
- 05:54, 14 August 2018 (diff | hist) . . (+1) . . m Fall 2018 GlueX Run (→Beam and Hall configuration)
- 05:53, 14 August 2018 (diff | hist) . . (+181) . . Fall 2018 GlueX Run (→Beam and Hall configuration)
- 05:42, 14 August 2018 (diff | hist) . . (-9) . . m Fall 2018 GlueX Run (→Readiness for Fall 17-Spring18 run)
- 08:33, 13 August 2018 (diff | hist) . . (-2) . . Fall 2018 GlueX Run (→Runplan)
- 08:31, 13 August 2018 (diff | hist) . . (+52) . . Fall 2018 GlueX Run (→Beam and Hall configuration)
- 08:30, 13 August 2018 (diff | hist) . . (+33) . . Fall 2018 GlueX Run (→General Information)
- 08:27, 13 August 2018 (diff | hist) . . (+1,806) . . Fall 2018 GlueX Run (→Readiness for Fall 17-Spring18 run)
- 08:18, 13 August 2018 (diff | hist) . . (-9,871) . . Fall 2018 GlueX Run (→Readiness for Fall 17-Spring18 run)
- 08:17, 13 August 2018 (diff | hist) . . (-1) . . Fall 2018 GlueX Run (→Hot Checkout)
- 08:16, 13 August 2018 (diff | hist) . . (-1,310) . . Fall 2018 GlueX Run (→Runplan time charts)
- 08:11, 13 August 2018 (diff | hist) . . (+23) . . m Fall 2018 GlueX Run (→Runplan)
- 08:08, 13 August 2018 (diff | hist) . . (-230) . . Fall 2018 GlueX Run (→Runplan)
- 07:36, 13 August 2018 (diff | hist) . . (+137) . . Fall 2018 GlueX Run (→General Information)
- 07:31, 13 August 2018 (diff | hist) . . (+5) . . m Fall 2018 GlueX Run (→General Information)
- 07:30, 13 August 2018 (diff | hist) . . (-83) . . Fall 2018 GlueX Run (→General Information)
- 17:43, 10 August 2018 (diff | hist) . . (+206) . . m Fall 2018 GlueX Run (→General Information)
- 17:36, 10 August 2018 (diff | hist) . . (-1,263) . . Fall 2018 GlueX Run (→General Information)
- 17:18, 10 August 2018 (diff | hist) . . (+60) . . Cryogenic Target Shift (→Routine Operation)
- 11:34, 10 August 2018 (diff | hist) . . (+28,482) . . Fall 2018 GlueX Run
- 10:58, 10 August 2018 (diff | hist) . . (-11) . . m Hall D Runs (→Running)
- 10:28, 10 August 2018 (diff | hist) . . (+20) . . m Main Page
- 10:24, 10 August 2018 (diff | hist) . . (-30) . . Main Page
- 07:54, 20 June 2018 (diff | hist) . . (-1) . . Hall D Runs (→Commissioning)
- 07:48, 20 June 2018 (diff | hist) . . (-27) . . Hall D Runs
- 08:04, 18 June 2018 (diff | hist) . . (+9) . . Hall D Runs (→Running)
- 08:01, 18 June 2018 (diff | hist) . . (-3,168) . . Hall D Runs (→Running)
- 15:30, 27 April 2018 (diff | hist) . . (+692) . . Hall D Runs (→Running)
- 14:25, 29 March 2018 (diff | hist) . . (+2) . . m Hall D Runs (→Running)
- 14:24, 29 March 2018 (diff | hist) . . (+30) . . m Hall D Runs (→Running)
- 14:18, 29 March 2018 (diff | hist) . . (0) . . m Hall D Runs (→Running)
- 14:18, 29 March 2018 (diff | hist) . . (+401) . . Hall D Runs (→Running)
- 17:51, 12 March 2018 (diff | hist) . . (+932) . . Hall D Runs (→Running)
- 07:49, 1 February 2018 (diff | hist) . . (+7) . . m Cryogenic Target Shift (→Routine Operation)
- 10:23, 22 December 2017 (diff | hist) . . (+101) . . Hall D Runs (→Running)
- 12:04, 4 December 2017 (diff | hist) . . (-65) . . Pair Spectrometer Shift (→Checking PS settings)
- 16:01, 15 November 2017 (diff | hist) . . (+2) . . Cryogenic Target Shift (→The Cryogenic Target)
- 10:13, 5 October 2017 (diff | hist) . . (+26) . . Fall 2017 Spring 2018 GlueX Run (→Detailed Running Plan)
- 10:12, 5 October 2017 (diff | hist) . . (+2,461) . . N Fall 2017 Spring 2018 GlueX Run (Created page with "==General Information== * Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D¶mExperimentEnergy=12GeV¶mExperimentSta...")
- 09:51, 5 October 2017 (diff | hist) . . (+52) . . Hall D Runs (→Running)
- 15:54, 7 June 2017 (diff | hist) . . (-9) . . Cryogenic Target Shift (→Routine Operation)
- 10:27, 24 April 2017 (diff | hist) . . (+541) . . N Sweeping magnet Shift (Created page with "The sweeping magnet (DW002 dipole) in the alcove is used to clean-up the charged particles created at the collimators. Its operational current value should be set to I=190A....") (current)
- 10:13, 24 April 2017 (diff | hist) . . (+47) . . Main Page
- 15:12, 18 April 2017 (diff | hist) . . (-68) . . Hall D Runs (→Running)
- 19:09, 14 February 2017 (diff | hist) . . (+2) . . Summary of the Fall 2016 GlueX Run (→Brief summary) (current)
- 17:15, 13 February 2017 (diff | hist) . . (0) . . m Hall D Runs (→Running)
- 17:15, 13 February 2017 (diff | hist) . . (+842) . . Hall D Runs (→Running)
- 17:07, 13 February 2017 (diff | hist) . . (+136) . . Hall D Runs (→Running)
- 17:01, 23 January 2017 (diff | hist) . . (+82) . . m Hall D Runs (→Running)
- 17:00, 23 January 2017 (diff | hist) . . (-106) . . m Spring 2017 GlueX Run (current)
- 16:59, 23 January 2017 (diff | hist) . . (+39) . . m Spring 2017 GlueX Run
- 16:58, 23 January 2017 (diff | hist) . . (+67) . . Spring 2017 GlueX Run (Redirected page to Run Coordination Meetings: Spring 2017 Run)
- 16:57, 23 January 2017 (diff | hist) . . (-67) . . m Spring 2017 GlueX Run
- 16:55, 23 January 2017 (diff | hist) . . (0) . . m Spring 2017 GlueX Run
- 16:53, 23 January 2017 (diff | hist) . . (-39) . . m Spring 2017 GlueX Run (Redirected page to Run Coordination Meetings: Spring 2017 Run)
- 16:49, 23 January 2017 (diff | hist) . . (+105) . . m Spring 2017 GlueX Run
- 16:59, 20 January 2017 (diff | hist) . . (+130) . . Summary of the Fall 2016 GlueX Run (→Brief summary)
- 16:30, 20 January 2017 (diff | hist) . . (0) . . m Summary of the Fall 2016 GlueX Run (→Brief summary)
- 16:15, 20 January 2017 (diff | hist) . . (+202) . . Summary of the Fall 2016 GlueX Run (→More detailed summary)
- 16:13, 20 January 2017 (diff | hist) . . (+112) . . Summary of the Fall 2016 GlueX Run (→Brief summary)
- 12:25, 20 January 2017 (diff | hist) . . (+14,333) . . N Summary of the Fall 2016 GlueX Run (Created page with "=Fall 2016 GlueX Run= ==Brief summary== Due to problems, the run was reduced from 2.5 months to less than a week of data taking, between Dec. 15th 2016 and Dec. 22nd 2016....")
- 11:42, 20 January 2017 (diff | hist) . . (+1) . . m Hall D Runs (→Running)
- 11:41, 20 January 2017 (diff | hist) . . (+40) . . Hall D Runs (→Running)
- 19:32, 10 January 2017 (diff | hist) . . (+2) . . Spring 2017 GlueX Run (→Detailed Running Plan)
- 15:37, 5 January 2017 (diff | hist) . . (+43) . . Spring 2017 GlueX Run (→List of Run Coordinators and Physics Division Liaison)
- 18:08, 4 January 2017 (diff | hist) . . (+51) . . Spring 2017 GlueX Run (→General Information)
- 16:57, 4 January 2017 (diff | hist) . . (+367) . . Spring 2017 GlueX Run (→List of Run Coordinators and Physics Division Liaison)
- 17:48, 15 September 2016 (diff | hist) . . (+67) . . Fall 2016 GlueX Run (→Fall 2016 GlueX production run)
- 17:44, 15 September 2016 (diff | hist) . . (-2) . . m Fall 2016 GlueX Run (→Previous run periods:)
- 17:43, 15 September 2016 (diff | hist) . . (+8) . . Fall 2016 GlueX Run
- 17:42, 15 September 2016 (diff | hist) . . (+2,524) . . Fall 2016 GlueX Run
- 17:32, 15 September 2016 (diff | hist) . . (+3) . . Fall 2016 GlueX Run (→Current run information)
- 17:31, 15 September 2016 (diff | hist) . . (+1,394) . . N Fall 2016 GlueX Run (Created page with "==Current run information== ==Previous run periods: * Fall 2014 Commissioning Plan. [http://argus.phys.uregina.ca/gluex/DocDB/0026/002649/001/Fall14_run_summary.pdf Sum...")
- 17:14, 15 September 2016 (diff | hist) . . (+114) . . Hall D Commissioning (→Commissioning Plans)
- 17:13, 15 September 2016 (diff | hist) . . (-2) . . Main Page
- 12:21, 10 March 2016 (diff | hist) . . (+1,550) . . Beam Line Detectors Shift (→Active Collimator)
- 18:45, 25 January 2016 (diff | hist) . . (+5) . . Hall D Commissioning (→Commissioning Plans)
- 18:44, 25 January 2016 (diff | hist) . . (+216) . . Hall D Commissioning (→Commissioning Plans)
- 11:00, 22 April 2015 (diff | hist) . . (+122) . . Pair Spectrometer Shift (→Checking PS settings)
- 16:48, 17 April 2015 (diff | hist) . . (+1) . . Spring 2015 6GeV Commissioning Plan (→Test goniometer control. Expected time: 12 shifts spanning 12 days) (current)
- 07:37, 17 April 2015 (diff | hist) . . (0) . . File:Spring15 comm.png (Deurpam uploaded a new version of File:Spring15 comm.png) (current)
- 11:19, 9 April 2015 (diff | hist) . . (-36) . . Spring 2015 6GeV Commissioning Plan (→Commissioning time chart)
- 11:17, 9 April 2015 (diff | hist) . . (0) . . File:Spring15 comm.png (Deurpam uploaded a new version of File:Spring15 comm.png)
- 09:23, 9 April 2015 (diff | hist) . . (-108) . . Spring 2015 6GeV Commissioning Plan (→Commissioning time chart)
- 09:22, 9 April 2015 (diff | hist) . . (+30) . . Spring 2015 6GeV Commissioning Plan
- 13:23, 8 April 2015 (diff | hist) . . (0) . . File:Spring15 comm.png (Deurpam uploaded a new version of File:Spring15 comm.png)
- 08:37, 8 April 2015 (diff | hist) . . (-4) . . Spring 2015 6GeV Commissioning Plan (→Commission Accelerator RF timing signal.)
- 08:37, 8 April 2015 (diff | hist) . . (0) . . N File:Spring15 comm.png
- 08:37, 3 April 2015 (diff | hist) . . (0) . . Spring 2015 6GeV Commissioning Plan
- 08:36, 3 April 2015 (diff | hist) . . (+9) . . Spring 2015 6GeV Commissioning Plan (→Commission Accelerator RF timing signal.)
- 08:36, 3 April 2015 (diff | hist) . . (0) . . N File:Schedule spring15.pdf (current)
- 08:35, 3 April 2015 (diff | hist) . . (+442) . . Spring 2015 6GeV Commissioning Plan
- 17:34, 2 April 2015 (diff | hist) . . (+144) . . Spring 2015 6GeV Commissioning Plan
- 17:30, 2 April 2015 (diff | hist) . . (0) . . Spring 2015 6GeV Commissioning Plan (→Commission fast feedbacks. Expected time 8h The four2h tests can be done when the solenoid is ramping up/down)
- 17:21, 2 April 2015 (diff | hist) . . (+313) . . Spring 2015 6GeV Commissioning Plan (→Test goniometer control. Expected time: 12 shifts spanning 12 days)
- 17:07, 2 April 2015 (diff | hist) . . (-126) . . Spring 2015 6GeV Commissioning Plan (→Test goniometer control. Expected time: 12 shifts spanning 12 days)
- 17:04, 2 April 2015 (diff | hist) . . (+571) . . Spring 2015 6GeV Commissioning Plan (→Test goniometer control. Expected time: 10 shifts spanning 12 days)
- 16:55, 2 April 2015 (diff | hist) . . (-8) . . Spring 2015 6GeV Commissioning Plan (→Commission fast feedbacks. Expected time 8h The four2h tests can be done when the solenoid is ramping up/down)
- 16:53, 2 April 2015 (diff | hist) . . (+210) . . Spring 2015 6GeV Commissioning Plan (→Commission fast feedbacks. Expected time ?)
- 16:46, 2 April 2015 (diff | hist) . . (+313) . . Spring 2015 6GeV Commissioning Plan
- 15:40, 2 April 2015 (diff | hist) . . (+151) . . Spring 2015 6GeV Commissioning Plan
- 11:07, 27 March 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 11:04, 27 March 2015 (diff | hist) . . (-7) . . Spring 2015 Commissioning Plan (→Restore Electron Beam)
- 15:24, 24 March 2015 (diff | hist) . . (+64) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 15:23, 24 March 2015 (diff | hist) . . (+116) . . Spring 2015 Commissioning Plan (→Restore Electron Beam)
- 10:01, 24 March 2015 (diff | hist) . . (+126) . . Cryogenic Target Shift (→Routine Operation)
- 17:51, 20 March 2015 (diff | hist) . . (+459) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 17:42, 20 March 2015 (diff | hist) . . (+285) . . Spring 2015 Commissioning Plan (→Verify subsystems under beam condition. 2 shifts)
- 10:15, 19 March 2015 (diff | hist) . . (+624) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Expected time ?)
- 10:08, 19 March 2015 (diff | hist) . . (+56) . . Spring 2015 Commissioning Plan (→Microscope bias voltage study: 4h)
- 10:07, 19 March 2015 (diff | hist) . . (+336) . . Spring 2015 Commissioning Plan
- 10:02, 19 March 2015 (diff | hist) . . (+113) . . Spring 2015 Commissioning Plan (→Restore Electron Beam)
- 10:01, 19 March 2015 (diff | hist) . . (-53) . . Spring 2015 Commissioning Plan (→Commission beam stability locks and fast feedbacks. Expected time ?)
- 17:45, 12 March 2015 (diff | hist) . . (0) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Expected time ?)
- 16:26, 12 March 2015 (diff | hist) . . (+272) . . Spring 2015 Commissioning Plan (→Forward Drift Chamber Alignment. Expected time 16h)
- 16:12, 12 March 2015 (diff | hist) . . (-28) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Start on or after March 16. Expected time ?)
- 16:07, 12 March 2015 (diff | hist) . . (+667) . . Beam Line Detectors Shift (→Collimator)
- 16:04, 12 March 2015 (diff | hist) . . (+261) . . Spring 2015 Commissioning Plan (→Commission cryogenic target. Expected time ?)
- 15:29, 12 March 2015 (diff | hist) . . (+26) . . Spring 2015 Commissioning Plan (→Verify subsystems under beam condition. 2 shifts)
- 09:54, 12 March 2015 (diff | hist) . . (+78) . . Main Page
- 09:48, 12 March 2015 (diff | hist) . . (+2) . . Beam Line Detectors Shift (→Move Collimator)
- 08:35, 12 March 2015 (diff | hist) . . (+247) . . Spring 2015 Commissioning Plan
- 08:29, 12 March 2015 (diff | hist) . . (-14) . . Spring 2015 Commissioning Plan (→Verify subsystems under beam condition. Expected time ?)
- 08:27, 12 March 2015 (diff | hist) . . (+9) . . Spring 2015 Commissioning Plan (→Ramp-up solenoid/Test target controls under magnetic field (4h) DONE)
- 08:27, 12 March 2015 (diff | hist) . . (+29) . . Spring 2015 Commissioning Plan (→Ramp-up solenoid/Test target controls under magnetic field (4h))
- 08:25, 12 March 2015 (diff | hist) . . (+51) . . Spring 2015 Commissioning Plan (→Commission beam stability locks and feedbacks. Expected time ?)
- 08:24, 12 March 2015 (diff | hist) . . (+23) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 07:37, 12 March 2015 (diff | hist) . . (+557) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 14:57, 10 March 2015 (diff | hist) . . (+463) . . Cryogenic Target Shift (→Expert personnel)
- 17:39, 9 March 2015 (diff | hist) . . (-1) . . Spring 2015 Commissioning Plan (→Collect More Regular Data: 2-3 weeks)
- 17:38, 9 March 2015 (diff | hist) . . (+66) . . Spring 2015 Commissioning Plan (→Collect More Regular Data: 2-3 weeks)
- 17:36, 9 March 2015 (diff | hist) . . (+336) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 2 Expected time ?)
- 15:58, 9 March 2015 (diff | hist) . . (-15) . . Spring 2015 Commissioning Plan (→Commission Accelerator RF timing signal. Expected time ?)
- 15:56, 9 March 2015 (diff | hist) . . (+99) . . Spring 2015 Commissioning Plan (→Commission Total Absorption Counter. 8h)
- 15:54, 9 March 2015 (diff | hist) . . (+167) . . Spring 2015 Commissioning Plan (→Collect More Regular Data: 2-3 weeks)
- 15:49, 9 March 2015 (diff | hist) . . (+346) . . Spring 2015 Commissioning Plan (→Collect More Regular Data)
- 14:59, 9 March 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Commission beam stability locks and feedbacks. Expected time ?)
- 14:59, 9 March 2015 (diff | hist) . . (+29) . . Spring 2015 Commissioning Plan (→Restore Electron Beam)
- 14:58, 9 March 2015 (diff | hist) . . (+42) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 08:34, 9 March 2015 (diff | hist) . . (+58) . . Spring 2015 Commissioning Plan (→Forward Drift Chamber Alignment. Expected time 8h)
- 08:32, 9 March 2015 (diff | hist) . . (+199) . . Spring 2015 Commissioning Plan (→Commission cryogenic target. Expected time ?)
- 09:53, 7 March 2015 (diff | hist) . . (+349) . . Spring 2015 Commissioning Plan (→Collect More Regular Data)
- 09:48, 7 March 2015 (diff | hist) . . (+203) . . Spring 2015 Commissioning Plan (→General Information)
- 09:42, 7 March 2015 (diff | hist) . . (+52) . . Spring 2015 Commissioning Plan (→Collect More Regular Data)
- 09:40, 7 March 2015 (diff | hist) . . (+234) . . Spring 2015 Commissioning Plan
- 09:36, 7 March 2015 (diff | hist) . . (+3) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Start on or after March 16. Expected time ?)
- 09:34, 7 March 2015 (diff | hist) . . (+44) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 09:32, 7 March 2015 (diff | hist) . . (+16) . . Spring 2015 Commissioning Plan (→Beam Configuration Parameters)
- 09:02, 7 March 2015 (diff | hist) . . (+33) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Start on or after March 16. Expected time ?)
- 08:59, 7 March 2015 (diff | hist) . . (+28) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Expected time ?)
- 08:59, 7 March 2015 (diff | hist) . . (+10) . . Spring 2015 Commissioning Plan (→Commission beam stability feedbacks. Expected time ?)
- 19:18, 6 March 2015 (diff | hist) . . (+60) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Expected time ?)
- 10:21, 4 March 2015 (diff | hist) . . (+110) . . Main Page
- 11:46, 25 February 2015 (diff | hist) . . (+2) . . Spring 2015 Commissioning Plan
- 20:49, 12 February 2015 (diff | hist) . . (+55) . . Spring 2015 Commissioning Plan (→Test goniometer control. Part 1 Expected time ?)
- 20:19, 12 February 2015 (diff | hist) . . (+143) . . Spring 2015 Commissioning Plan (→Beam Configuration Parameters)
- 08:08, 11 February 2015 (diff | hist) . . (-77) . . Spring 2015 Commissioning Plan (→General Information)
- 17:50, 9 February 2015 (diff | hist) . . (+273) . . Spring 2015 Commissioning Plan
- 17:32, 9 February 2015 (diff | hist) . . (+52) . . Spring 2015 Commissioning Plan (→Commission beam stability feedbacks. Expected time ?)
- 17:29, 9 February 2015 (diff | hist) . . (-72) . . Spring 2015 Commissioning Plan (→Commission cryogenic target. Expected time ?)
- 17:28, 9 February 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Test goniometer control. Expected time ?)
- 17:28, 9 February 2015 (diff | hist) . . (+326) . . Spring 2015 Commissioning Plan (→Commission cryogenic target. Expected time ?)
- 15:16, 9 February 2015 (diff | hist) . . (-13) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 08:16, 4 February 2015 (diff | hist) . . (+70) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 08:12, 4 February 2015 (diff | hist) . . (+146) . . Spring 2015 Commissioning Plan (→Commission cryogenic target. Expected time ?)
- 12:04, 2 February 2015 (diff | hist) . . (+5) . . Spring 2015 Commissioning Plan (→Trigger optimization. Expected time ?)
- 12:01, 2 February 2015 (diff | hist) . . (+72) . . Spring 2015 Commissioning Plan (→Trigger optimization. Expected time ?)
- 11:46, 2 February 2015 (diff | hist) . . (+115) . . Spring 2015 Commissioning Plan (→Commission Total Absorption Counter. Expected time ?)
- 10:12, 2 February 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 09:32, 28 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan
- 08:40, 28 January 2015 (diff | hist) . . (+85) . . Spring 2015 Commissioning Plan (→General Information)
- 20:16, 27 January 2015 (diff | hist) . . (+71) . . Spring 2015 Commissioning Plan (→Test goniometer control. Expected time ?)
- 12:13, 21 January 2015 (diff | hist) . . (+1,021) . . Spring 2015 Commissioning Plan (→Restore Photon Beam. Expected time ?)
- 12:08, 21 January 2015 (diff | hist) . . (+530) . . Spring 2015 Commissioning Plan (→Restore Electron Beam)
- 09:25, 21 January 2015 (diff | hist) . . (+345) . . Spring 2015 Commissioning Plan (→Restore Electron Beam)
- 09:20, 21 January 2015 (diff | hist) . . (-39) . . Spring 2015 Commissioning Plan (→Forward Drift Chamber Alignment. ? Expected time 8h)
- 09:17, 21 January 2015 (diff | hist) . . (+21) . . Spring 2015 Commissioning Plan (→Beam Configuration Parameters)
- 08:33, 16 January 2015 (diff | hist) . . (+52) . . Spring 2015 Commissioning Plan (→General Information)
- 20:23, 14 January 2015 (diff | hist) . . (+40) . . Spring 2015 Commissioning Plan (→General Information)
- 20:19, 14 January 2015 (diff | hist) . . (+3) . . Spring 2015 Commissioning Plan (→Commission Accelerator timing signal. Expected time ?)
- 20:18, 14 January 2015 (diff | hist) . . (+126) . . Spring 2015 Commissioning Plan (→Run Plan)
- 20:15, 14 January 2015 (diff | hist) . . (-22) . . Spring 2015 Commissioning Plan (→General Information)
- 11:40, 12 January 2015 (diff | hist) . . (-1) . . Spring 2015 Commissioning Plan (→Commission Photon beam polarimeter. ? Expected time ?)
- 11:40, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Forward Drift Chamber Alignment. ? Expected time ?)
- 11:40, 12 January 2015 (diff | hist) . . (+3) . . Spring 2015 Commissioning Plan (→Run Plan)
- 11:38, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Trigger optimization Expected time ?)
- 11:35, 12 January 2015 (diff | hist) . . (+3) . . Spring 2015 Commissioning Plan (→Commission cryogenic target. Expected time ?)
- 11:34, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Commission cryogenic target. Expected time ?)
- 11:34, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Verify subsystems under beam condition Expected time ?)
- 11:33, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Commission cryogenic target Expected time ?)
- 11:33, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Commission beam stability feedbacks Expected time ?)
- 11:33, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Restore Photon Beam Expected time ?)
- 11:32, 12 January 2015 (diff | hist) . . (-30) . . Spring 2015 Commissioning Plan (→Verify subsystems under beam condition Expected time ?)
- 11:32, 12 January 2015 (diff | hist) . . (0) . . Spring 2015 Commissioning Plan (→Commission beam stability feedbacks Expected time ?)
- 11:32, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Restore Photon Beam Expected time ?)
- 11:31, 12 January 2015 (diff | hist) . . (0) . . Spring 2015 Commissioning Plan (→Restore Photon Beam Expected time ?)
- 11:31, 12 January 2015 (diff | hist) . . (+1) . . Spring 2015 Commissioning Plan (→Restore Electron Beam)
- 11:30, 12 January 2015 (diff | hist) . . (+1,580) . . Spring 2015 Commissioning Plan (→Run Plan)
- 10:45, 12 January 2015 (diff | hist) . . (+227) . . Spring 2015 Commissioning Plan (→General Information)
- 10:44, 12 January 2015 (diff | hist) . . (+59) . . Spring 2015 Commissioning Plan (→Beam Configuration Parameters)
- 10:32, 12 January 2015 (diff | hist) . . (-1,740) . . Spring 2015 Commissioning Plan
- 10:28, 12 January 2015 (diff | hist) . . (-6) . . Hall D Commissioning
- 10:27, 12 January 2015 (diff | hist) . . (-2) . . Hall D Commissioning (→Commissioning Plans)
- 10:27, 12 January 2015 (diff | hist) . . (+60) . . Hall D Commissioning (→Commissioning Plans)
- 10:14, 12 January 2015 (diff | hist) . . (0) . . N File:Location detect2.jpg (current)
- 09:02, 12 January 2015 (diff | hist) . . (+7,375) . . N Spring 2015 Commissioning Plan (Created page with "'''This page gives the run plan for the Fall 2014 commissioning. It is a controlled document that can be edited only by E. Chudakov, E. Smith or A. Deur. Suggestions and comme...")
- 09:00, 12 January 2015 (diff | hist) . . (+37) . . Hall D Commissioning
- 12:19, 9 January 2015 (diff | hist) . . (+4) . . Shift check-list
- 12:17, 9 January 2015 (diff | hist) . . (+156) . . Shift check-list
- 18:15, 17 December 2014 (diff | hist) . . (+1,582) . . Post-thanksgiving period (→Post-thanksgiving period) (current)
- 09:34, 16 December 2014 (diff | hist) . . (+25) . . Post-thanksgiving period (→Post-thanksgiving period)
- 09:33, 16 December 2014 (diff | hist) . . (+287) . . Post-thanksgiving period (→Post-thanksgiving period)
- 09:39, 15 December 2014 (diff | hist) . . (+180) . . Post-thanksgiving period (→Post-thanksgiving period)
- 08:30, 12 December 2014 (diff | hist) . . (+297) . . Post-thanksgiving period (→Post-thanksgiving period)
- 15:44, 8 December 2014 (diff | hist) . . (+439) . . Post-thanksgiving period (→Post-thanksgiving period)
- 08:08, 5 December 2014 (diff | hist) . . (+256) . . Post-thanksgiving period (→Post-thanksgiving period)
- 08:04, 5 December 2014 (diff | hist) . . (+9) . . Post-thanksgiving period (→Post-thanksgiving period)
- 08:03, 5 December 2014 (diff | hist) . . (+1) . . Post-thanksgiving period (→Post-thanksgiving period)
- 08:02, 5 December 2014 (diff | hist) . . (+1,136) . . Post-thanksgiving period (→Post-thanksgiving period)
- 17:20, 3 December 2014 (diff | hist) . . (+236) . . Post-thanksgiving period (→Post-thanksgiving period)
- 17:17, 3 December 2014 (diff | hist) . . (-4) . . Post-thanksgiving period (→Post-thanksgiving period)
- 17:16, 3 December 2014 (diff | hist) . . (+474) . . Post-thanksgiving period (→Post-thanksgiving period)
- 08:21, 3 December 2014 (diff | hist) . . (+280) . . Post-thanksgiving period (→Post-thanksgiving period)
- 08:11, 3 December 2014 (diff | hist) . . (+52) . . Post-thanksgiving period (→Post-thanksgiving period)
- 20:07, 2 December 2014 (diff | hist) . . (+108) . . Post-thanksgiving period (→Post-thanksgiving period)
- 20:07, 2 December 2014 (diff | hist) . . (+1) . . Post-thanksgiving period (→Post-thanksgiving period)
- 20:06, 2 December 2014 (diff | hist) . . (+117) . . Post-thanksgiving period (→Post-thanksgiving period)
- 19:48, 2 December 2014 (diff | hist) . . (+11) . . Post-thanksgiving period (→Post-thanksgiving period)
- 19:46, 2 December 2014 (diff | hist) . . (-7) . . Post-thanksgiving period (→Post-thanksgiving period)
- 19:46, 2 December 2014 (diff | hist) . . (+1) . . Post-thanksgiving period (→Post-thanksgiving period)
- 19:44, 2 December 2014 (diff | hist) . . (+18) . . Post-thanksgiving period (→Post-thanksgiving period)
- 19:44, 2 December 2014 (diff | hist) . . (+8) . . Post-thanksgiving period (→Tune Photon Beam)
- 19:44, 2 December 2014 (diff | hist) . . (+862) . . Post-thanksgiving period (→Tune Photon Beam)
- 19:29, 2 December 2014 (diff | hist) . . (+543) . . Post-thanksgiving period (→Tune Photon Beam)
- 19:16, 2 December 2014 (diff | hist) . . (+2,096) . . N Post-thanksgiving period (Created page with "==Tune Photon Beam== * '''Goal''': Continue detector/trigger/DAQ checkout * '''Prerequisites''': # Hall D detectors on. # Solenoid magnetic field at 800A. # Monitoring avai...")
- 18:57, 2 December 2014 (diff | hist) . . (+33) . . Fall 2014 Commissioning Plan (→Run Plan)
- 16:11, 15 November 2014 (diff | hist) . . (+12) . . Tagging Spectrometer Shift (→Voltage Settings and Control)
- 16:09, 15 November 2014 (diff | hist) . . (-17) . . Tagging Spectrometer Shift (→Voltage Settings and Control)
- 16:09, 15 November 2014 (diff | hist) . . (+150) . . Tagging Spectrometer Shift (→Voltage Settings and Control)
- 16:07, 15 November 2014 (diff | hist) . . (0) . . N File:TAGM-MPOD-voltages.png (current)
- 16:06, 15 November 2014 (diff | hist) . . (+411) . . Tagging Spectrometer Shift (→Voltage Settings and Control)
- 08:13, 15 November 2014 (diff | hist) . . (+34) . . Tagging Spectrometer Shift (→Expert personnel)
- 09:06, 31 October 2014 (diff | hist) . . (+70) . . Tune Photon Beam and collect data for initial detector checkout (→Tune Photon Beam) (current)
- 17:36, 28 October 2014 (diff | hist) . . (+34) . . Tune Photon Beam and collect data for initial detector checkout (→Tune Photon Beam)
- 17:28, 28 October 2014 (diff | hist) . . (+232) . . Procedure installing solid target (→Procedure:) (current)
- 07:33, 27 October 2014 (diff | hist) . . (-112) . . Tune Photon Beam and collect data for initial detector checkout (→Tune Photon Beam)
- 07:28, 27 October 2014 (diff | hist) . . (+94) . . Tune Photon Beam and collect data for initial detector checkout (→Tune Photon Beam)
- 07:26, 27 October 2014 (diff | hist) . . (+18) . . Tune Photon Beam and collect data for initial detector checkout (→Tune Photon Beam)
- 07:25, 27 October 2014 (diff | hist) . . (+239) . . N How to read BCAL Scalers (Created page with "=== How to read BCal Scalers=== # Open Hall-D CSS EPICS Control if not already available following instructions. # From '''Mai...") (current)
(newest | oldest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)