Uncategorized pages
Showing below up to 41 results in range #101 to #141.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- Solenoid expert pxi
- Solid Target Expert
- Solid Target Shift
- Solid Target Shift Original
- Spring 2015 6GeV Commissioning Plan
- Spring 2015 Commissioning Plan
- Spring 2017 GlueX Run
- Standard Production Running Conditions
- Start Counter Commissioning
- Start Counter Expert
- Start Counter Shift
- Summary Fall 2019 Run
- Summary Fall 2021 Run
- Summary Fall 2022 Run
- Summary Spring 2019 Run
- Summary Spring 2020 Run
- Summary Summer 2020 Run
- Summary Winter 2023 Run
- Summary Winter 2024 Run
- Summary of the Fall 2015
- Summary of the Fall 2016 GlueX Run
- Summary of the Spring 2015 GlueX Run
- Summary of the Spring 2016 Run
- Summary of the Spring 2017 Run
- Summary of the Spring 2018 Run
- Summary summer 2022 Run
- Summer 2020 CDC HV scan procedure
- Summer 2022 detector checkout + CDC scans
- Sweeping magnet Shift
- Tagging Spectrometer Expert
- Tagging Spectrometer Shift
- Threshold Scan Procedure
- Time-of-Flight System Commissioning
- Time-of-Flight System Expert
- Time-of-Flight System Shift
- Training and Safety
- Tune Electron Beam
- Tune Photon Beam
- Tune Photon Beam and collect data for initial detector checkout
- Turn FDC ON
- Winter 2023 detector checkout + CDC scan